Business

Brixton Metals Drills 234.0m of 0.57% CuEq within 582.44m of 0.45% CuEq within 779.65m of 0.37% CuEq at its Camp Creek Porphyry Target, Thorn Project

VANCOUVER, British Columbia, Jan. 16, 2023 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to

articleBrixton Metals CorporationJanuary 16, 20234/company/brixton-metals-corporation/news/brixton-metals-drills-2340m-of-057percent-cueq-within-58244m-of-045percent-cueq-within-77965m-of-037percent-cueq-at-its-camp-creek-porphyry-target-thorn-project
Brixton Metals Drills 234.0m of 0.57% CuEq within 582.44m of 0.45% CuEq within 779.65m of 0.37% CuEq at its Camp Creek Porphyry Target, Thorn Project

About this update from Brixton Metals Corporation

[{"type":"text","content":" VANCOUVER, British Columbia, Jan. 16, 2023 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to report its final 2022 drilling results from the Camp Creek Cu-Au-Ag-Mo Porphyry Target on its wholly owned Thorn Project located in Northwestern British Columbia, Canada. The Thorn Project is located within the Taku River Tlingit and Tahltan First Nation’s traditional territory. Highlights High grade gold was intercepted above the porphyry yielding 55.8 g/t Au over 1.5m Hole THN22-221 yielded 779.65m of 0.37% CuEq ending in mineralization at 1375m Including 582.44m of 0.45% CuEq Including 234.00m of 0.57% CuEq from 940m depth Including 20.85m of 0.78% CuEq This large copper dominant porphyry target remains wide open, including at depth Chairman & CEO, Gary Thompson, stated, “We are very pleased with the 2022 program at the Camp Creek Porphyry Target as it continues to demonstrate large-scale upside potential. During the 2023 exploration campaign we are delighted to work alongside our strategic investor BHP by formulating the BHP-Brixton joint technical committee to study the 2022 data and develop a plan to unlock the Camp Creek potential through a deep drilling program. We plan to start the fully funded 2023 drill program in late April to early May.” Figure 1. Location Map of the Camp Creek Target and Copper Geochemistry. The Camp Creek acid-sulphate alteration and geochemical expression further to the east-northeast is covered and unconformably overlain by a late rhyolite flowdome complex, which suggests the porphyry mineralization may continue under this volcanic cover (see Figure 1) providing for a 1km by 2km porphyry target area. Table 1. Select Intervals of Mineralization in Hole THN22-221.   Hole ID From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) CuEq (%)*     THN22-221 186.00 219.50 33.50 0.12 0.56 22.33 1.08 0.61       449.50 451.00 1.50 0.03 55.80 33.50 10.95       including 595.50 1375.15 779.65 0.23 0.05 2.46 234.71 0.37     including 792.00 1374.44 582.44 0.29 0.06 2.76 297.20 0.45     including 940.00 1174.00 234.00 0.40 0.09 3.44 278.84 0.57     including 1058.95 1079.80 20.85 0.55 0.12 4.34 389.76 0.78   All assay values are uncut weighted averages. Intervals...

More updates from Brixton Metals Corporation