Business

Brixton Metals Doubles Talisker Zone Strike and Drills 34.8 m of 1.33g/t AuEq and 3 m of 9.9 g/t AuEq

VANCOUVER, Aug. 17, 2011 /CNW/ - Brixton Metals Corporation (TSX-V: BBB) (the " Company " or ...

articleBrixton Metals CorporationAugust 17, 20115/company/brixton-metals-corporation/news/brixton-metals-doubles-talisker-zone-strike-and-drills-348-m-of-133gt-aueq-and-3-m-of-99-gt-aueq
Brixton Metals Doubles Talisker Zone Strike and Drills 34.8 m of 1.33g/t AuEq and 3 m of 9.9 g/t AuEq

About this update from Brixton Metals Corporation

[{"type":"text","content":"\n\n\n\n\n\nVANCOUVER, Aug. 17, 2011 /CNW/ - Brixton Metals Corporation (TSX-V: BBB)\n (the \"Company\" or \"Brixton\") is pleased to announce assay results from three Talisker Zone holes\n of the proposed 25 hole drill program at its Thorn gold-silver-copper\n project located in Northwest British Columbia. Significantly, these\n early results increase the drilled strike length of the Talisker Zone\n mineralization from 200 to 400 m. The Talisker Zone remains open along\n strike and depth.\n\n\nMr. Gary R. Thompson, Chairman CEO stated, \"This is a very promising\n start to the 2011 program. Recent mapping and fieldwork has identified\n new targets and advanced historical concepts of known vein corridors at\n the Thorn Property. Drilling continues to test new targets and further\n our understanding of known mineralized zones. We are all encouraged to\n see the continuity of gold-silver-copper mineralization and extension\n of the Talisker Zone by 200 meters\n\n\nDrill hole THN11-41 was drilled at the Talisker Zone as a 56 m step-out\n on strike to the northeast from 2005 hole THN05-37.  Hole THN11-41\n intersected 2.47 g/t AuEq over 10.15 m including 4.69 g/t AuEq over\n 3.95 m and 6.28 g/t AuEq over 1.04 m.\n\n\nDrill hole THN11-42 was collared as a 200 m step-out to the northeast\n from historical hole THN05-37. This hole intersected 9.90 g/t AuEq over\n 3.00 m from 81.24 m and also intersected 1.33 g/t AuEq over 34.82 m\n from a lower mineralized interval starting from 117.82 m including 3.43\n g/t AuEq over 2.68 m and 4.17 g/t AuEq over 1.0 m.\n\n\nDrill hole THN11-43 was collared 30 m to the southwest from historic\n hole TH05-36 and cut 1.88 g/t AuEq over 2.91 m from 141.91 m. See table\n below for drill results.\n\n\nClick Here to See 2011 Current Drilling Results Map\n\n\nTalisker Zone Drilling Results 2011 \n\n\nHole ID\n\n\nFrom m\n\n\nTo m\n\n\nInterval m\n\n\nAuEq g/t\n\n\nAu g/t\n\n\nAg g/t\n\n\nCu %\n\n\nTHN11-41\n\n\n72.93\n\n\n83.08\n\n\n10.15\n\n\n2.47\n\n\n1.71\n\n\n37.7\n\n\n0.04\n\n\nincluding\n\n\n77.07\n\n\n81.02\n\n\n3.95\n\n\n4.69\n\n\n3.49\n\n\n62.0\n\n\n0.04\n\n\nincluding\n\n\n79.98\n\n\n81.02\n\n\n1.04\n\n\n6.28\n\n\n5.91\n\n\n15.4\n\n\n0.04\n\n\nTHN11-42\n\n\n81.24\n\n\n88.39\n\n\n7.15\n\n\n4.45\n\n\n0.89\n\n\n60.5\n\n\n1.22\n\n\nincluding\n\n\n81.24\n\n\n84.24\n\n\n3.00\n\n\n9.90\n\n\n1.72\n\n\...

More updates from Brixton Metals Corporation