Business

Brenmiller Energy Provides Tempo Project Operational Update

Electrical Works Completed; Commissioning Expected to Begin Mid-February TEL AVIV, IL / ACCESS Newswire / February 4, 2026 / Brenmiller Energy Ltd. (NASDAQ:BNRG) ("Brenmiller", "Brenmiller Energy" or the "Company"), a provider of thermal energy storage ...

articleBrenmiller Energy LtdFebruary 4, 20264/company/brenmiller-energy-ltd-ordinary-shares/news/brenmiller-energy-provides-tempo-project-130200075
Brenmiller Energy Provides Tempo Project Operational Update

About this update from Brenmiller Energy Ltd

[{"type":"text","content":"Electrical Works Completed; Commissioning Expected to Begin Mid-February","length":72,"tagName":"p"},{"type":"text","content":"TEL AVIV, IL / ACCESS Newswire / February 4, 2026 / Brenmiller Energy Ltd. (NASDAQ:BNRG) ("Brenmiller", "Brenmiller Energy" or the "Company"), a provider of thermal energy storage ("TES") solutions for industrial and utility customers, today provided an operational update on its flagship project for Tempo Beverages Ltd. ("Tempo").","length":382,"tagName":"p"},{"type":"text","content":"The Company announced that electrical works at the Tempo site have been completed, marking a major milestone in the project's development and enabling full electrification of the TES system.","length":194,"tagName":"p"},{"type":"table","headerItems":[],"items":[{"val":[{"style":"padding:.75pt;width:48.84%;","val":[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"url":"https://media.zenfs.com/en/accesswire.ca/78ba0e0923cae670a4c7ab0ec60a0603","width":278,"height":720}},"href":"https://app.accessnewswire.com/imagelibrary/efcb928f-7894-4933-b0f4-e7ab5121d3a5/1133516/image202602040855028sask2.jpeg?v=2","hrefExternal":true,"rel":"nofollow"}]},{"style":"padding:.75pt;width:.92%;","val":[]},{"style":"padding:.75pt;width:48.84%;","val":[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"url":"https://media.zenfs.com/en/accesswire.ca/7593fb3779198e39f844234c261fabd4","width":277,"height":720}},"href":"https://app.accessnewswire.com/imagelibrary/ca232aef-e859-4b39-850a-b2021b4137e4/1133516/image20260204085502kc6ki1.jpeg?v=2","hrefExternal":true,"rel":"nofollow"}]}]}],"length":0},{"type":"text","content":"With the completion of this phase, the TES system is now electrically connected and capable of supporting large-scale electric charging, converting electricity into dispatchable industrial heat. The electrical scope included installation and integration of the system's cabling, transmission infrastructure, switching equipment, and heating components.","length":356,"tagName":"p"},{"type":"text","content":"Following completion of the electrical works, commissioning activities are expe...

More updates from Brenmiller Energy Ltd

The Companythermal energy storageTESAvi BrenmillerTempoCompanyBrenmiller Energy Ltdelectrical works