Business

Brenmiller Energy Marks Construction Milestone for Wolfson Medical Center Clean Heat Project

HOLON, ISRAEL / ACCESS Newswire / February 17, 2026 /Brenmiller Energy (NASDAQ:BNRG) ("Brenmiller", "Brenmiller Energy" or the "Company"), a global provider of thermal energy storage ("TES") solutions for industrial and institutional decarbonization, ...

articleBrenmiller Energy LtdFebruary 17, 20264/company/brenmiller-energy-ltd-ordinary-shares/news/brenmiller-energy-marks-construction-milestone-133000247
Brenmiller Energy Marks Construction Milestone for Wolfson Medical Center Clean Heat Project

About this update from Brenmiller Energy Ltd

[{"type":"text","content":"HOLON, ISRAEL / ACCESS Newswire / February 17, 2026 / Brenmiller Energy (NASDAQ:BNRG) ("Brenmiller", "Brenmiller Energy" or the "Company"), a global provider of thermal energy storage ("TES") solutions for industrial and institutional decarbonization, today announced the groundbreaking of its TES project during a ceremony held at the Wolfson Medical Center ("Wolfson") campus in Holon, Israel.","length":445,"tagName":"p"},{"type":"text","content":"The project, developed by Brenmiller Energy in collaboration with Baran Energy, a subsidiary of the Baran Group Ltd. ("Baran"), represents a major step toward reducing emissions from hospital operations while lowering long term energy costs. Total investment in the project is approximately $4 million.","length":312,"tagName":"p"},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":"Brenmiller Energy","className":"","disableSlideshowImg":false,"size":{"original":{"width":542,"height":320,"url":"https://media.zenfs.com/en/accesswire.ca/1b01854f6b8e84a9bb0edc934dd9fd5f"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/1HWrxNnW2KuWRO91TI0P0w--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTU2NztjZj13ZWJw/https://media.zenfs.com/en/accesswire.ca/1b01854f6b8e84a9bb0edc934dd9fd5f","width":542,"height":320}},"href":"https://app.accessnewswire.com/imagelibrary/30adbd80-601a-468f-9e00-a3f04b94caa1/image.jpeg","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"The TES system will replace existing fossil fuel powered steam boilers with an electricity-based TES system, supplying the hospital with clean steam for its ongoing medical and operational needs. The initiative is anticipated to reduce carbon emissions by approximately 3,900 tons per year, equivalent to the annual emissions of roughly 1,000 passenger vehicles, while generating annual energy cost savings of approximately $1.5 million.","length":437,"tagName":"p"},{"type":"text","content":"Construction of the TES system is anticipated to be completed during 2026, with commercial operations anticipated in early 2027. The project was endorsed by the Ministry of Health and the Ministry of Energy.","length":207,"tagName":"p"},{"type":"text","content":""The project is anticipated to significantly reduce, and over time potentially eliminate, fuel consump...

More updates from Brenmiller Energy Ltd

Wolfson Medical Centerthermal energy storageBrenmiller EnergyThe CompanyTESMinistry of EnergyBaran Energy