Business
Brenmiller Energy to Localize Manufacturing of bGen™ Thermal Energy Batteries to Capitalize on Commercial Opportunities in Europe and the U.S.
TEL AVIV, Israel, March 26, 2025--Brenmiller Energy Ltd. ("Brenmiller", "Brenmiller Energy" or the "Company") (NASDAQ: BNRG), a leading global provider of thermal energy storage ("TES") solutions to industrial and utility markets, today announced its strategic decision to forgo the €3.5 million Tranche B commitment from the EIB credit facility agreement in favor of exploring potential establishment of manufacturing facilities in Europe and in the United States. This decision comes as the Company
About this update from Brenmiller Energy Ltd
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1024,"height":512,"url":"https://media.zenfs.com/en/business-wire.com/d62f4bd4459c61b7ea8fff805e4d31d1"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/yXBLtl5iMSwIY0X8_7b2Ng--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/d62f4bd4459c61b7ea8fff805e4d31d1","width":960,"height":480},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/rKiqH2xdTa5Cp9W0ZHobkA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIwNDg7aD0xMDI0O2NmPXdlYnA-/https://media.zenfs.com/en/business-wire.com/d62f4bd4459c61b7ea8fff805e4d31d1","width":1024,"height":512}},"lazy":false},{"type":"list","items":[{"val":[{"type":"text","content":"Local manufacturing expected to improve margins, leverage domestic incentives, and create jobs","length":94,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Brenmiller successfully utilized €4 million from the European Investment Bank ("EIB") non-dilutive credit facility to build its gigafactory in Israel supporting current projects; at full capacity, the facility can support revenues of up to $200 million annually","length":271,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Current tranche availability will expire on March 31st, 2025, and the Company will not actively seek to extend it and rather prioritize the potential development of localized manufacturing facilities in Europe and in the U.S.","length":225,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":590,"olType":false},{"type":"text","content":"TEL AVIV, Israel, March 26, 2025--(BUSINESS WIRE)--Brenmiller Energy Ltd. ("Brenmiller", "Brenmiller Energy" or the "Company") (NASDAQ: BNRG), a leading global provider of thermal energy storage ("TES") solutions to industrial and utility markets, today announced its strategic decision to forgo the €3.5 million Tranche B commitment from the EIB credit facility agreement in favor of exploring potential establishment of manufacturing facilities in Europe and in the United States. This decision comes as the Company's global project pipeline exceeds $500 million in potential value, with significant opportunities in both European and U.S. markets.","length":694,"t...