Business

Bonterra Intersects 21.9 g/t Au over 4.4 m; Including 158.5 g/t over 0.5 m at the Barry Underground Project

Val-d'Or, Quebec--(Newsfile Corp. - December 12, 2022) - Bonterra Resources Inc. (TSXV: BTR) (OT...

articleBonterra Resources, Inc.December 12, 20225/company/bonterra-resources-inc/news/bonterra-intersects-219-gt-au-over-44-m-including-1585-gt-over-05-m-at-the-barry-underground-project
Bonterra Intersects 21.9 g/t Au over 4.4 m; Including 158.5 g/t over 0.5 m at the Barry Underground Project

About this update from Bonterra Resources, Inc.

[{"type":"text","content":"Bonterra Intersects 21.9 g/t Au over 4.4 m; Including 158.5 g/t over 0.5 m at the Barry Underground ProjectVal-d'Or, Quebec--(Newsfile Corp. - December 12, 2022) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) (\"Bonterra\" or the \"Company\") is pleased to announce more results from the ongoing infill drilling campaign at the Barry underground project. The Company commenced a 125,000 metres (\"m\") drill program at the Barry underground deposit last August, which contains 0.5 million ounces of Measured and Indicated Mineral resources and 0.7 million ounces of Inferred Mineral resources, as stated in the last mineral resource estimate (the \"2021 MRE\", see press release dated June 23, 2021). To date, 21,800 m (51 holes) of infill drilling has been completed from the surface, mainly in the upper half of the Barry underground deposit. Since the previous release dated November 15, 2022, assays from 11 holes have been received. Highlights from these assays are presented in the present release. Highlights include:21.9 g/t Au over 4.4 m, including 158.5 g/t Au over 0.5 m in hole MB-22-5417.5 g/t Au over 2.8 m, including 30.3 g/t Au over 0.6 m in hole MB-22-54213.0 g/t Au over 3.7 m, including 49.7 g/t Au over 0.5 m and 6.7 g/t Au over 3.9 m, including 27.2 g/t Au over 0.7 m and 4.3 g/t Au over 5.8 m, including 24.2 g/t Au over 0.5 m in hole MB-22-547A8.1 g/t Au over 4.0 m, including 44.5 g/t Au over 0.7 m in hole MB-22-548Marc André Pelletier, President and CEO, commented: \"The ongoing infill drill program at Barry is focused on the upper half of the underground deposit and continues to deliver high-grade results. It is common to intercept more than one lens of mineralization in a single drill hole at Barry. For example, numerous high-grade intercepts are reported across six different lenses in drill hole MB 22-547A; highlighted by 13.0 g/t Au over 3.7 m in lens AB17; 6.7 g/t Au over 3.9 m in lens 800; and 4.3 g/t Au over and 5.8 m in lens H11. The Company intends to continue infill drilling the Barry deposit next year with two diamond drills on surface at a rate of approximately 6,000 m per month.\"Diamond Drilling Results Highlights: Figure 1 - Barry Project -Surface Plan, Holes, and Highlights Location To view an enhanced version of Figure 1, please visit:https://images.newsfilecorp.com/files/1528/...

More updates from Bonterra Resources, Inc.