Business
InvestmentPitch Media Video Discusses Blue Star Gold's Drill Program Including Report of 8.15m of 20.8 g/t gold in New Vein System at Ulu, High Lake Greenstone Belt, Nunavut - Video News Alert on Investmentpitch.com
Vancouver, British Columbia--(Newsfile Corp. - September 2, 2021) - Blue Star Gold Corp. (TSXV...

About this update from Blue Star Gold Corp.
[{"type":"text","content":"InvestmentPitch Media Video Discusses Blue Star Gold's Drill Program Including Report of 8.15m of 20.8 g/t gold in New Vein System at Ulu, High Lake Greenstone Belt, Nunavut - Video News Alert on Investmentpitch.comVancouver, British Columbia--(Newsfile Corp. - September 2, 2021) - Blue Star Gold Corp. (TSXV: BAU) (FSE: 5WP0), a gold company focused on exploration and development within Nunavut, Canada, has reported 8.15 metres of 20.8 grams per tonne gold in a new vein system at Ulu. Blue Star Gold owns the Ulu Gold Property lease, an advanced gold project, and the highly prospective Hood River Property that is contiguous to the Ulu mining lease.For more information, please view the InvestmentPitch Media \"video\" which provides additional information on the company. If this link is not enabled, please visit www.InvestmentPitch.com and enter \"Blue Star\" in the search box.Cannot view this video? Visit:http://www.investmentpitch.com/video/1_o4n1jpcb/Blue-Star-Gold-reports-815-metres-of-208-gt-gold-in-a-new-vein-system-at-Ulu-High-Lake-Greenstone-Belt-NunavutWith the recent acquisition of the Roma Project, the company now controls more than 16,000 hectares of highly prospective and underexplored mineral properties in the High Lake Greenstone Belt, Nunavut.The 2021 exploration campaign is evaluating a number of high priority targets in the area of the known high-grade Flood Zone Gold Deposit on the Ulu Project, as well as high potential targets along the Ulu fold hinge. Numerous priority targets exist along the 5 km long Ulu fold which extends from the Flood Zone Deposit up to the contiguous Hood River Project up to the NFN Zone. Objectives of this year's program include better understanding the controls of higher-grade zones within the structures, evaluating additional structures on and adjacent to the Ulu fold hinge, and expanding and infilling previously known mineralized zones that have had only limited drilling.Currently two drills are operating with 3,000 metres of diamond drilling completed in 14 drill holes representing approximately 55% of the planned metres. Drilling focused on targets proximal to the historical Flood Zone resource area with the initial two holes evaluating lightly drilled geologically complex areas in the Flood Zone. Subsequent drilling has evaluated parallel altered and mineralized...