Business

Blue Sky Uranium Reports Positive Final Infill Drilling Results as It Advances Towards Prefeasibility-Feasibility Studies at Ivana Deposit, Amarillo Grande Project, Argentina

Vancouver, British Columbia--(Newsfile Corp. - January 12, 2026) - Blue Sky Uranium Corp. (TSXV:...

articleBlue Sky Uranium Corp.January 12, 20264/company/blue-sky-uranium-corp/news/blue-sky-uranium-reports-positive-final-infill-drilling-results-as-it-advances-towards-prefeasibility-feasibility-studies-at-ivana-deposit-amarillo-grande-project-argentina
Blue Sky Uranium Reports Positive Final Infill Drilling Results as It Advances Towards Prefeasibility-Feasibility Studies at Ivana Deposit, Amarillo Grande Project, Argentina

About this update from Blue Sky Uranium Corp.

[{"type":"text","content":"Blue Sky Uranium Reports Positive Final Infill Drilling Results as It Advances Towards Prefeasibility-Feasibility Studies at Ivana Deposit, Amarillo Grande Project, ArgentinaVancouver, British Columbia--(Newsfile Corp. - January 12, 2026) - Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTCQB: BKUCF), \"Blue Sky\" or the \"Company\") and Ivana Minerales S.A. (\"IMSA\", the operating company for the joint-venture between Blue Sky and a subsidiary of Corporacion America Group, \"COAM\") are pleased to report the complete results of the infill drilling program at the Ivana Deposit (as announced on June 16, 2025), Amarillo Grande Project in Rio Negro Province, Argentina. Completing the infill drill program was a key step identified in the recent Gap Analysis for moving the project forward towards prefeasibility (see Press Release November 26, 2025). Nikolaos Cacos, Blue Sky President & CEO, commented, \"The infill drilling program represents an important technical milestone for Ivana and it was completed on time for us to maintain the schedule established in our recent Gap Analysis. By tightening drill spacing in mineralized areas, the program provides increased geological confidence and valuable data to support ongoing and future technical studies.\"The program included 328 holes totaling 4,959 metres of reverse circulation (\"RC\") drilling, with holes averaging 15 metres in depth (Figure 1). The objectives of the program were: 1. To confirm the continuity of the mineralization within the deposit; 2. To refine mineralization/deposit limits; and 3. To support upgrading the classification of some of the current inferred resources in a future mineral resource estimate update. To date, a total of 1,166 drill holes comprising 15,828 metres of RC drilling have been completed at the Ivana Deposit.Table 1 presents the collar coordinates and collar data for the 328 holes, as well as selected intervals of uranium mineralization with at least 1m ≥30ppm U3O8. Assays results indicate that approximately 15% of the holes (51 holes) intercepted at least 1m @ 0.1% or 1,000ppm U3O8; with values up to 1m @ 0.7% or 7,000ppm U3O8 (in hole AGI-884). The program also includes drilling in an area of the deposit not previously tested due to access, including zones proximal to where the high-grade intervals were returned (see light blue outline...

More updates from Blue Sky Uranium Corp.