Business
Hackberry Silver Project - Phase 1 Drilling Intersects 1.65 metres Grading 667 grams Ag/tonne
Hackberry Silver Project – Phase 1 Drilling Intersects 1.65 metres Grading...

About this update from Bitterroot Resources Ltd.
[{"type":"text","content":"Hackberry Silver Project – Phase 1 Drilling Intersects 1.65 metres Grading 667 grams Ag/tonne \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Hackberry Silver Project – Phase 1 Drilling Intersects 1.65 metres Grading 667 grams Ag/tonne\n West Vancouver, British Columbia (FSCwire) - Bitterroot Resources Ltd. (BTT, TSX-V) has completed 1,582 metres of drilling in eight (8) holes at its Hackberry Silver Project in Mohave County, Arizona. This Phase 1 program was the first drill-test of the area adjacent to the main Hackberry Mine’s underground workings and down-dip of the Hackberry South adit. Maps and cross-sections describing the areas drilled are available on the Company’s website www.bitterrootresources.com. Assay results have been received from the first six (6) holes, which are presented below.\n\n \n\nDrilling has confirmed that the Hackberry mineralized trend exhibits good continuity and a consistent pattern of alteration zonation along the 400 met...