Business
Bitterroot Resources Confirms High Nickel Grades in Semi-Massive Sulphide Mineralization
VANCOUVER, BC / ACCESSWIRE / March 30, 2021 / Bitterroot Resources Ltd. ( TSXV:BTT ) has rec...

About this update from Bitterroot Resources Ltd.
[{"type":"text","content":"Bitterroot Resources Confirms High Nickel Grades in Semi-Massive Sulphide MineralizationVANCOUVER, BC / ACCESSWIRE / March 30, 2021 / Bitterroot Resources Ltd. (TSXV:BTT) has received assays for hole LM 21-07 at its LM Project in the Upper Peninsula of Michigan. The assays confirm that semi-massive sulphides intersected in hole LM 21-07 are enriched in nickel and copper, as previously modelled. The mineralized interval consists of an estimated true thickness of 3.50 metres containing 0.71 metres of semi-massive sulphides grading 5.16% nickel and 1.18% copper, overlain by an estimated true thickness of 2.79 metres of disseminated sulphide mineralization grading 0.78% nickel and 0.83% copper.LM 21-07: Estimated True Thickness of Mineralized IntervalsInterval(m)Rock TypeNi (%)Cu (%)Au + PGM (ppm)2.79Upper Disseminated Mineralization - Est. True Thickness0.780.830.250.71Semi-Massive Sulphide - Est. True Thickness5.161.180.823.50TOTAL TRUE THICKNESS1.670.900.36LM 21-07: Details of Mineralized Intervals From(m)To(m)Interval(m)Rock TypeNi (%)Cu(%)Au + PGM(ppm)270.07272.192.12Peridotite0.540.740.24272.19272.270.08Massive sulphide clast*7.137.910.63272.27273.000.73Peridotite0.750.320.22273.00273.750.75Semi-Massive Sulphide5.161.180.82 *included in disseminated mineralized interval LM 21-07: Summary of Mineralized IntervalFrom(m)To (m)Interval (m)Rock TypeNi(%)Cu(%)Au + PGM (ppm)270.07273.002.93Upper DisseminatedMineralization0.780.830.25273.00273.750.75Semi-Massive Sulphide5.161.180.82 Highlights of the assays from LM 21-07 include;The high-grade nickel (5.1%) and copper (1.18%) in semi-massive sulphides confirms the previously-modelled high metal tenor of massive sulphide mineralization in the system,A clast of massive sulphide within the disseminated mineralized interval contains extremely high nickel (7.13%) and copper (7.91%) grades. This \"rip-up\" clast was transported along the conduit by magmatic processes, suggesting the presence of a nearby body of high-grade, copper-nickel rich massive sulphide,The nickel and copper grade of the disseminated mineralization in hole LM 21-07 is 34% higher than the grade of the disseminated mineralization intersected in hole LM 20-01,The increasing grades and sulphide content of LM 21-07 compared to mineralization in LM 20-01 and LM 21-10 provides a vector to potential areas of higher-grade massi...