Business

Hyperscale Data Kicks Off Significant Build-Out at Michigan Campus to Power NVIDIA Blackwell Artificial Intelligence Infrastructure

Hyperscale Data, Inc. (NYSE American: GPUS), a diversified holding company ("Hyperscale Data" or the "Company"), today announced that it has begun the process of converting a portion of the space and power at its Michigan Data Center (the "Michigan Facility") to enable additional capacity to support artificial intelligence ("AI") solutions. The Company has already begun ordering the necessary equipment and initial construction has begun on the portions of the Michigan Facility that are dedicated

articleBitcoinSeptember 26, 20255/company/bitcoin/news/hyperscale-data-kicks-off-significant-build-out-at-michigan-campus-to-power-nvidia-blackwell-artificial-intelligence-infrastructure-1
Hyperscale Data Kicks Off Significant Build-Out at Michigan Campus to Power NVIDIA Blackwell Artificial Intelligence Infrastructure

About this update from Bitcoin

[{"type":"text","content":"LAS VEGAS, Sept. 26, 2025 /PRNewswire/ -- Hyperscale Data, Inc. (NYSE American: GPUS), a diversified holding company ("Hyperscale Data" or the "Company"), today announced that it has begun the process of converting a portion of the space and power at its Michigan Data Center (the "Michigan Facility") to enable additional capacity to support artificial intelligence ("AI") solutions. The Company has already begun ordering the necessary equipment and initial construction has begun on the portions of the Michigan Facility that are dedicated to AI operations.","length":610,"tagName":"p"},{"type":"image","alt":"Official Corporate Logo of Hyperscale Data, Inc. All rights reserved 2024 - 2025 (PRNewsfoto/Hyperscale Data Inc.)","displaySize":"","headline":null,"caption":"Official Corporate Logo of Hyperscale Data, Inc. All rights reserved 2024 - 2025 (PRNewsfoto/Hyperscale Data Inc.)","className":"","disableSlideshowImg":false,"size":{"original":{"width":400,"height":202,"url":"https://media.zenfs.com/en/prnewswire.com/1961508f0c670512019c1d2aac5fcd0b"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/4CDfa8a7wPOQ8iUorGubSA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTcwNTtoPTM1NjtjZj13ZWJw/https://media.zenfs.com/en/prnewswire.com/1961508f0c670512019c1d2aac5fcd0b","width":400,"height":202},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/bE69CI_Hm2g7rVv_d1S_cw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTY0MDtoPTMyMztjZj13ZWJw/https://media.zenfs.com/en/prnewswire.com/1961508f0c670512019c1d2aac5fcd0b","width":400,"height":202}},"href":"https://mma.prnewswire.com/media/2734592/Hyperscale_Data_Inc_Blue_Stacked_Logo.html","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"The Michigan Facility sits on 34.5 acres, utilizes approximately 28 megawatts and includes a 617,000-square-foot data center building, providing the scale and flexibility to support both Bitcoin mining and advanced AI compute in the same location. This dual-use model follows a proven playbook, where blockchain infrastructure and AI can successfully coexist under one roof.","length":374,"tagName":"p"},{"type":"text","content":"Current AI operations include 16 servers populated with NVIDIA graphics processing units housed in a dedicated data hall, which will remain active during the site enhancements. The Company has also begun preparati...

More updates from Bitcoin

The CompanyHyperscaleData CenterBitcoin miningCompany