Business
Benton and Sokoman Announce Exploration Update for Kraken Lithium and Hydra Cesium Discoveries in Southwestern Newfoundland
Thunder Bay, Ontario--(Newsfile Corp. - March 28, 2023) - Benton Resources Inc. (TSXV: BEX) ("B...

About this update from Benton Resources, Inc.
[{"type":"text","content":"Benton and Sokoman Announce Exploration Update for Kraken Lithium and Hydra Cesium Discoveries in Southwestern NewfoundlandThunder Bay, Ontario--(Newsfile Corp. - March 28, 2023) - Benton Resources Inc. (TSXV: BEX) (\"Benton\") and Sokoman Minerals Corp. (TSXV: SIC) (OTCQB: SICNF) (\"Sokoman\") together, (the \"Alliance\") are pleased to provide an exploration update and outline immediate plans for the 50-50 Golden Hope Joint Venture (GHJV). The GHJV was formed by the Alliance in 2021 to explore the mineral potential of an underexplored structural belt of rocks in southwestern Newfoundland hosting past-producing gold operations. Within the first week of exploration, the Alliance had discovered the very first hard rock lithium dyke on the Island, and in the fall of 2022, the Alliance discovered the very first cesium-rich dyke. These two areas of high-grade mineralization are now known as the Kraken Lithium Pegmatite Field and the Hydra Dyke. Prospecting, trenching, mapping, soil geochemistry, and three (3) phases of diamond drilling during the 2021 and 2022 field seasons, have resulted in multiple new discoveries which remain wide open for expansion. Golden Hope JV Project - Kraken Lithium Pegmatite Field to Hydra DykeTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/3657/160127_a10d940e94674941_003full.jpgThe Alliance would like to report that it has also renewed and received approval for its camp permits along with continued exploration permits for the entire GHJV land position. These permits allow for a fourth phase diamond drilling program consisting of a minimum of 5,000 metres along with prospecting, soil sampling, and geological mapping along the highly-favourable trend. The fourth phase, 5,000-metre drill program is anticipated to start within the next few weeks and camp preparation will start as soon as next week. Highlights from earlier phases of drilling at the Kraken Lithium Pegmatite Field have returned very promising results including: 1.04% Li2O over 15.23 m, including 4.18 m of 1.48% Li2O and 2.98 m of 1.23% Li2O in GH-22-27 on the newly discovered Killick Zone 0.95% Li2O over 8.40 m from 47.8 m to 56.2 m, including 1.76% Li2O over 0.80 m in GH-22-01 on the Kraken Main Dyke 5.50 m at 1.16% Li2O within a wider intersection of 20.82 m averaging 0.60% Li2O in drill hole G...