Business
Bell Copper Advances La Balsa Feasibility Study and Van Dyke Programs for 2011
Jun. 20, 2011 (Canada NewsWire Group) -- TSX-V Symbol: BCU VANCOUVER, June 20, 2011 /CN...

About this update from Bell Copper Corporation
[{"type":"text","content":"\n\n\n Jun. 20, 2011 (Canada NewsWire Group) -- \n\n#ReleaseContent TABLE\n{\n BORDER-COLLAPSE: collapse\n}\nTR.cnwUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTR.cnwDoubleUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTR.cnwBoldUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px solid\n}\nTD.cnwUnderlinedCell\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTD.cnwDoubleUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTD.cnwBoldUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px solid\n}\n#ReleaseContent TABLE.cnwBorderedTable TD\n{\n BORDER-RIGHT: black 1px solid;\n PADDING-RIGHT: 2px;\n BORDER-TOP: black 1px solid;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n BORDER-LEFT: black 1px solid;\n PADDING-TOP: 2px;\n BORDER-BOTTOM: black 1px solid;\n BORDER-COLLAPSE: collapse\n}\n#ReleaseContent TABLE TD\n{\n PADDING-RIGHT: 2px;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n PADDING-TOP: 2px\n}\n\n\nTSX-V Symbol: BCU\n\n\nVANCOUVER, June 20, 2011 /CNW Telbec/ - Bell Copper Corporation ("Bell Copper" or the "Company") (TSXV: BCU) is pleased to announce its\n exploration and development plans for its La Balsa and Van Dyke\n projects for the balance of 2011, following the successful closing of\n its $4.5 million equity private placement.\n\n\nLa Balsa Project, Mexico:  At the Company's wholly owned La Balsa project, work continues on the\n previously announced feasibility study for the mining of low\n strip-ratio, surface breccia copper resources. This work follows a\n March 2010 Scoping Study which projected annual production of 21\n million pounds of copper per year over a seven year mine life, with\n cash costs of US $0.81/lb and all-in costs (including capital, and the\n use of the Company's previously purchased SX-EW processing plant) of\n $1.22/lb.  As part of this study, a 2,000 metre in-fill drill program\n is commencing to provide further definition to the oxide/sulphide\n transition zones.  Metallurgical testing is also in progress with an\n aim toward determining the optimal method for processing material\n within these transition zones.\n\n\nDrilling to test for a buried copper porphyry under the surface breccias\n at La Balsa is in progress with the hole at 780 metres depth. The\n porphyry system is targeted at 800 metres depth, below a thrust fault\n which is belie...