Business

Bedford Metals Announces Multiphase Exploration Program At Sheppard Lake Uranium Project

(TheNewswire) Vancouver, B C - April 3, 2025— TheNewswire - ...

articleBedford Metals CorpApril 3, 20255/company/bedford-metals-corp/news/bedford-metals-announces-multiphase-exploration-program-at-sheppard-lake-uranium-project
Bedford Metals Announces Multiphase Exploration Program At Sheppard Lake Uranium Project

About this update from Bedford Metals Corp

[{"type":"text","content":"Bedford Metals Announces Multiphase Exploration Program At Sheppard Lake Uranium Project\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n Vancouver, B\n \n\n C -\n \n\n\n\n April 3,\n \n\n 2025—\n \n\n TheNewswire -\n \n\n\n\n\n Bedford Metals Corp.\n \n\n\n (\n \n\n TSX-V: BFM, FWB: O8D, ISIN:\nCA0762301012\n \n\n ) (the “\n \n\n Company\n \n\n ” or\n“\n \n\n\n\n\n\n Bedford\n \n\n ”)\n \n\n is pleased\nto unveil details of its comprehensive 2025 exploration program at the\nSheppard Lake Uranium Project, situated in northern Saskatchewan\nwithin the southern Athabasca Basin. The project integrates the former\nUbiquity Lake, Cable Lake, and Sheppard Lake properties.\n \n\n\n\n The multiphase program, fully funded by Bedford, will\nencompass airborne geophysics, extensive groundwork, and diamond\ndrilling.\n \n\n\n\n Phase 1\n \n\n involves a 747-line kilometer MobileMT survey, employing cutting-edge\nairborne electromagnetic technology and the latest AFMAG advancements.\nThis heliborne survey captures geoelectrical data up to 1 kilometer\ndeep with exceptional spatial and resistivity resolution, effectively\ndelineating magnetic breaks and subsurface conductors.\n \n\n\n\n Phase 2\n \n\n comprises a comprehensive field initiative covering the entire\n13,092-hectare project area, including newly acquired Cable Lake and\nexisting Ubiquity Lake claims. The primary objective is to refine\nexisting diamond drill targets and identify new areas of interest\nacross the expansive Sheppard Lake property. Focus areas include TZ1,\nTZ2, VTEM conductors, and historic radiometric anomalies identified in\nprevious airborne surveys. Geophysical data from Phase 1 will guide\ntarget identification and prioritization.\n \n\n\n\n The field team, consisting of a five-person exploration\ncrew, will conduct systematic prospecting, radiometric surveys, and\nground magnetometer studies. Radon gas cups will be strategically\ndeployed to assess subsurface uranium potential, leveraging radon gas\nas a primary indicator of mineralization. The field program will\noperate in two phases, utilizing helicopter support for remote or\nlogistically challenging zones.\n \n\n\n\n Phase 3\n \n\n will\ntarget high-priority areas with diamond drilling, aiming to validate\nexplorat...

More updates from Bedford Metals Corp