Business
BCM Intercepts 510 ft @ 0.66% Cu in Phase 3 Drilling at Thompson Knolls Greenfield Cu-Au Porphyry Project, Utah, USA
VANCOUVER, BC / ACCESSWIRE / May 24, 2023 / BCM Resources Corp ("B" or "Company") is pleased to ...

About this update from Bcm Resources Corporation
[{"type":"text","content":"BCM Intercepts 510 ft @ 0.66% Cu in Phase 3 Drilling at Thompson Knolls Greenfield Cu-Au Porphyry Project, Utah, USAVANCOUVER, BC / ACCESSWIRE / May 24, 2023 / BCM Resources Corp (\"B\" or \"Company\") is pleased to update its shareholders on the progress at Thompson Knolls (TK) greenfield Cu-Au-Ag-Mo porphyry project in southwestern Utah, USA. Phase 3 drilling at TK (see Company previous NR BCM Resources Corp. | News)envisaged drilling of seven core holes. \"B\" reports that, to date, four drill holes have been completed. Assay results have been received for three of these drillholes (TK7, TK8, and TK9). The highlight of the assay results is a significant mineral intercept of 510 ft (155.4 m) @ 0.66% Cu, 0.12 g/t Au, and 7.4 g/t Ag in drillhole TK8, with 8 sample intervals containing values greater than 1% Cu over 80 ft (24.3 m).President & CEO Dr. Sergei Diakov stated, \"I am very excited about this very encouraging mineralized intercept in drillhole TK8 as it indicates significant potential for the TK project to host a sizable copper-gold porphyry system with skarn mineralization. We continue testing TK project potential focusing our exploration porphyry Cu expertise to vector-in on the discovery of the greenfield porphyry system copper core.\"Summary of Drillhole TK8TK8 was collared between TK3 and TK5 drillholes (see map BCM Resources Corp. | News). It was drilled vertically, reaching a downhole depth of 3,062.5 ft (933.45 m). The hole was designed to test the north-western flank of the TK magnetic anomaly and continuity of mineralization from TK3. At 1,915 ft (583.7 m) depth, TK8 intercepted mineralized diopside-marble skarn oxidized to a 2,040 ft (621.8 m) depth and then encountered primary magnetite-chalcopyrite mineralization that was documented for an extended interval from 2,040 ft (621.8 m) to 3,050 ft (929.6 m), a total of 1,010 ft (307.8 m). Sampling returned assay results averaging 0.40% Cu, 0.08 g/t Au and 4.92 g/t Ag, including a more intensely mineralized interval from 2,040 ft (621.8 m) to 2,550 ft (777.2 m) of total 510 ft (155.4 m) @ 0.66% Cu, 0.12 g/t Au and 7.4 g/t Ag, with 8 sample intervals containing values greater than 1% Cu over 80 ft (24.3 m).Summary of Drillhole TK7Drillhole TK7 was drilled vertically to a depth of 1,230 ft (375 m) and located SSW of hole TK3 which was drilled vertically to a de...