Business
Bayhorse Silver Started Operations with New German Made KSS100 X-Ray Transmissive "Ore-Sorter" at Bayhorse Silver Mine in Oregon - Video Available on Investmentpitch.com
Vancouver, British Columbia--(Newsfile Corp. - December 5, 2017) - Bayhorse Silver's (TSXV: BH...

About this update from Bayhorse Silver Inc.
[{"type":"text","content":"Bayhorse Silver Started Operations with New German Made KSS100 X-Ray Transmissive \"Ore-Sorter\" at Bayhorse Silver Mine in Oregon - Video Available on Investmentpitch.comVancouver, British Columbia--(Newsfile Corp. - December 5, 2017) - Bayhorse Silver's (TSXV: BHS) (OTC: KXPLF) (FSE: 7KXN) has started operations with its new KSS100 X-Ray Transmissive \"Ore-Sorter\" at the Bayhorse Silver Mine. Following the equipment's lengthy trip from Germany, Steinert's US personnel conducted their standard \"on-site comprehensive pre-commissioning tests.InvestmentPitch.com has produced a \"video\" which discusses this news. If this link is not enabled, please visit www.InvestmentPitch.com and enter \"Bayhorse\" in the search box. Cannot view this video? Visit:http://www.investmentpitch.com/video/0_ldfhwsim/Bayhorse-Silver-TSXVBHS-has-started-operations-with-its-new-KSS100-X-Ray-Transmissive-Ore-Sorter-at-the-Bayhorse-Silver-MineThe final step was installing the three ore-sorting algorithms that were developed from mineralized material shipped by Bayhorse to the US test facility at Walton, Kentucky in May. The equipment is installed at the company's historic Bayhorse Silver Mine in Oregon, in which the company has earned an 80% interest.Graeme O'Neill, President & CEO, stated: \"Commissioning the KSS 100 Ore-Sorter, with state-of-the-art sensing and sorting technology, concludes a major milestone by installing cutting-edge technology to separate mineralized from non-mineralized material at the Bayhorse Silver Mine. The Ore-Sorter is completely automatic, with sorting operations and performance monitored remotely by both Steinert and the Company. Steinert can change the operational characteristics and sorting algorithms of the Ore-Sorter at their US operations center, without ever needing to do a site visit.\"Upgrading the 1,300 tonnes of stockpiled silver mineralized oxide and sulphide material, from underground development conducted concurrent with the Ore-Sorter installation, will continue through to January, 2018, with the mine operating on a 7 day and week schedule. This stockpile was derived from both the upper level workings and the two new mineralized zones in the intermediate level.The first mineralized material to be processed through the Ore-Sorter is from the Sunshine Zone in the upper level, where grab samples from blasted m...