Business
Banyan Gold Continues to Extend Powerline Mineralization Beyond Existing Resource and Between Deposits, AurMac, Yukon, Canada
VANCOUVER, BC / ACCESS Newswire / December 9, 2025 /Banyan Gold Corp. (the "Company" or "Banyan") (TSXV:BYN)(OTCQB:BYAGF) continues to expand and upgrade the Powerline Deposit ("Powerline") at its AurMac Project ("AurMac"), First Nation of Na-Cho ...
About this update from Banyan Corp(oregon)
[{"type":"text","content":"VANCOUVER, BC / ACCESS Newswire / December 9, 2025 / Banyan Gold Corp. (the "Company" or "Banyan") (TSXV:BYN)(OTCQB:BYAGF) continues to expand and upgrade the Powerline Deposit ("Powerline") at its AurMac Project ("AurMac"), First Nation of Na-Cho Nyäk Dun Traditional Territory, Yukon. The diamond drillholes reported here intersected new high-grade domains extending Powerline mineralization to a new area southwest of the main deposit and demonstrating the continuity of high-grade in the central Powerline deposit and between the Airstrip Deposit.","length":591,"tagName":"p"},{"type":"text","content":"Highlights:","length":11,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"AX-25-690 - 1.15 g/t Au over 10.5m within 0.74 g/t Au over 45.5m, including high-grade intervals of 6.82 g/t Au over 1.9m and 9.75 g/t Au over 1.0m","length":147,"tagName":"p"}]},{"val":[{"type":"text","content":"AX-25-694 - 4.27 g/t Au over 2.0m within 0.62 g/t Au over 28.6m","length":63,"tagName":"p"}]},{"val":[{"type":"text","content":"AX-25-724 - 4.60 g/t Au over 5.9m within 0.64 g/t Au over 55.4m; including high-grade interval of 14.90 g/t Au over 1.5m","length":120,"tagName":"p"}]},{"val":[{"type":"text","content":"AX-25-728 - 0.86 g/t au over 16.5m and 1.03 g/t au over 6.8m","length":60,"tagName":"p"}]},{"val":[{"type":"text","content":"AX-25-741 - 1.97 g/t Au over 3.3m within 0.29 g/t Au over 78.2m","length":63,"tagName":"p"}]},{"val":[{"type":"text","content":"AX-25-746 - 1.70 g/t Au over 5.7 m within 0.92 g/t Au over 18.8 m","length":65,"tagName":"p"}]},{"val":[{"type":"text","content":"AX-25-748 - 3.41 g/t Au over 0.5m and 0.65 g/t Au over 12.2m within 0.30 g/t Au over 89.1m","length":90,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":608,"olType":false},{"type":"text","content":"Banyan Gold has completed its 2025 drilling program with 178 holes over 42,700 m completed; with the last core shipped to the assay lab from camp last week. Thank you to our team, service providers, suppliers, consultants, and partners for a productive year.","length":258,"tagName":"p"},{"type":"text","content":""We have successfully intersected high-grade intervals at the Resource pit edge with additional sheeted veins hosting coarse sulphosalts, sulphides and visible gold in follow-up step o...