Business
Mineral Mountain Provides Drilling Progress at Standard Mine Gold Project Black Hill Area of South Dakota, USA
Mineral Mountain Provides Drilling Progress at Standard Mine Gold Project Black Hill Area ...

About this update from Badlands Resources Inc
[{"type":"text","content":"\n\n\n\nMineral Mountain Provides Drilling Progress at Standard Mine Gold Project Black Hill Area of South Dakota, USA\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, Nov. 14, 2019\n\n\n\nMMV-TSX-VMNRLF-OTCQBM8M-FRANKFURT\n VANCOUVER, Nov. 14, 2019 /CNW/ - Mineral Mountain Resources Ltd. and Mineral Mountain Resources (SD) Inc. (\"Mineral Mountain\" or the \"Company\") (TSXV: \"MMV\") is pleased to announce that  the 1600 m \"trunk hole\", ST19-011, designed to test two historical high grade gold zones (Target 1 and Target 2) is progressing as planned and on target. \n\n \n \n\n \nHighlights:\nTrunk Hole ST19-011 has progressed to 655 m as of November 10, 2019The trunk hole has been drilled mostly in stratigraphic hanging wall rocks (Poverty Gulch Phyllite) to the Rochford Iron FormationVariably mineralized, sheared and hydrothermally altered zones were encountered from 374 m through to 608 m down hole depth in Trunk Hole ST19-011, and are interpreted to constitute various anastomosing branches of the target East Limb Shear zone. Details of certain mineralized intervals are described below:374 m -383 m: A sheared, brecciated grey quartz-flooded alteration zone (60% vein material/40% altered phyllite) was intersected. The zone contains medium grained to coarse arsenopyrite throughout. Locally arsenopyrite is semi-massive to massive (>50%) but comprises 3-7% overall through the interval. Subordinate pyrrhotite ranges from 1-3%. (https://mineralmtn.com/projects/rochford/maps-images/ )449 m -457 m: White to smoky grey quartz vein with several per cent pyrrhotite, trace arsenopyrite and hydrothermal chlorite. (https://mineralmtn.com/projects/rochford/maps-images/ 3D Longitudinal view looking west-southwest showing drilling progress. (https://mineralmtn.com/projects/rochford/maps-images/)Samples have been routinely submitted to ALS Laboratory for fire assay gold and for pathfinder arsenic analyses. The Company has yet to receive any analytical results for this hole. The Company is also pleased to an...