Business
Aztec Reports Additional Six Drill Holes from Tombstone Project, Arizona Including 1.01 gpt Gold Equivalent Over 48.8 m
Six-hole South Drill Pattern was drilled ~460 meters south of the previously released four-...

About this update from Aztec Minerals Corp.
[{"type":"text","content":"Aztec Reports Additional Six Drill Holes from Tombstone Project, Arizona Including 1.01 gpt Gold Equivalent Over 48.8 mSix-hole South Drill Pattern was drilled ~460 meters south of the previously released four-hole Central Drill Pattern along the Contention PitFinal five-holes now complete, results pendingAcquired 15 additional unpatented claims south of Contention PitSurface grab sampling of old mine dumps west of the Contention Pit assay up to 47.2 gpt Au and 2,808 gpt AgVANCOUVER, BC / ACCESSWIRE / November 30, 2020 / Aztec Minerals Corp. (TSXV:AZT)(OTCQB:AZZTF) announces the results of six drill holes from the South Drill Pattern along the Contention Pit at the Tombstone project in Southeastern Arizona. Highlights include a 48.77 meter (m) interval grading 1.01 grams per tonne (gpt) gold equivalent (AuEq at 80:1 gold:silver ratio) (0.38 gpt gold and 50.7 gpt silver) in hole TR20-13.The South Drill Pattern was drilled approximately 460 m south of the previously released four-hole Central Drill Pattern (see news release dated September 29, 2020). Drilling of the final five is now complete with results pending. This concludes the Phase 1 RC drill program for a total of 21 holes and 2,993 meters.The South Drill Pattern tested an area where no known historic drilling had taken place and discovered strong silver-gold-lead-zinc mineralization hosted in altered sandstone and siltstone. Phase 1 drilling has now verified gold-silver +/- lead-zinc mineralization along an 830 m length of the north-south Contention structure, open to the south and at depth.South Drill Pattern SummaryThe South Drill Pattern is highlighted by drill hole TR20-13 which entered the mineralized zone at 12.19 m depth and bottomed in mineralization at 60.96 m in depth due to loss of the hole. Higher grade intervals include 3.03 gpt AuEq (0.64 gpt Au and 190.9gpt Ag) over 6.1 m and 1.41 gpt AuEq (0.43 gpt gold and 78.4 gpt silver) over 25.91 m.View Tombstone 2020 RC Drill Program Plan Map and Drill Sections here:Link to section view hole TR20-11 and hole TR20-10Link to section view hole TR20-12 and hole TR20-10Link to section view hole TR20-13 and hole TR20-10Link to section view hole TR20-14 and hole TR20-15Link to section view hole TR20-16All six holes intersected old mine workings, likely dating back to the late 1800's, indicating that the highest-grade bonanz...