Business

Aztec Expands Drilling Program at the Tombstone Project, Arizona

VANCOUVER, BC - December 4, 2025 (NEWMEDIAWIRE) - Aztec Minerals Corp. (AZT: TSX-V, OTCQB: AZZTF) ("Aztec" or the "Company") announces an update to the...

articleAztec Minerals Corp.December 4, 20257/company/aztec-minerals-corp/news/aztec-expands-drilling-program-tombstone-120000373
Aztec Expands Drilling Program at the Tombstone Project, Arizona

About this update from Aztec Minerals Corp.

[{"type":"text","content":"VANCOUVER, BC - December 4, 2025 (NEWMEDIAWIRE) - Aztec Minerals Corp. (AZT: TSX-V, OTCQB: AZZTF) ("Aztec" or the "Company") announces an update to the ongoing Tombstone Property Reverse Circulation and Core drilling program in Southeastern Arizona. The 2025 drilling program has now completed 34 RC drill holes, 13 drill holes have been reported (please see new releases dated August 14, September 23, and October 31, 2025). The drilling program has completed 5,960 meters of RC drilling and 495m of core drilling to date. The company currently has 21 RC drill holes awaiting geochemical analysis at the Bureau Veritas Laboratory.","length":651,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Program expanded to a minimum 8,500 meters & extended into Q1 2026","length":70,"tagName":"p"}]},{"val":[{"type":"text","content":"34 RC holes have now been drilled ","length":33,"tagName":"p"}]},{"val":[{"type":"text","content":"21 holes are pending results as the drilling program continues","length":62,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":165,"olType":false},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1399,"height":1978,"url":"https://media.zenfs.com/en/newsmediawire_165/3763d77db5e9752a5b766e7927ae6fb0"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/DR_zWip3..0wAfg4YlzcZQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTEzNTc7Y2Y9d2VicA--/https://media.zenfs.com/en/newsmediawire_165/3763d77db5e9752a5b766e7927ae6fb0","width":960,"height":1357},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/22Mm0id3Uf1TZ_ETOzHFzQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTI0MDA7aD0zMzk0O2NmPXdlYnA-/https://media.zenfs.com/en/newsmediawire_165/3763d77db5e9752a5b766e7927ae6fb0","width":1200,"height":1697}}},{"type":"text","content":"Drilling Program Expansion","length":26,"tagName":"p"},{"type":"text","content":"The Company also announces that the Tombstone Property JV Management Committee met recently and approved an expansion of the drill program from 7,500 meters to at least 8,500 meters. The expanded program comprises of 7,000 meters of RC and a minimum of 1,500 meters of core drilling and is now expected to extend into the first quarter of 2026.","length":344,"tagName":"p"},{"type":"text","cont...

More updates from Aztec Minerals Corp.

Bureau VeritasAztec Minerals Corp.AztecCore drillingdrilling programThe companygeochemical analysisAztec Mineralsdrill holesthe Tombstone