Business
Petro-Victory Energy provides update on the conclusion of drilling the AND-5 well in the 100% owned Andorinha field, onshore, Brasil
Petro-Victory Energy Corp. (TSXV: VRY) ("Petro-Victory" or the "Company") is pleased to announce that the drilling operations for the AND-5 well, in partnership with Azevedo & Travassos Energia ("ATE"), located in the Andorinha Field, Potiguar Basin, Rio Grande do Norte, were successfully concluded.

About this update from Azevedo & Travassos Sa
[{"type":"text","content":"DALLAS, July 9, 2025 /PRNewswire/ - Petro-Victory Energy Corp. (TSXV: VRY) ("Petro-Victory" or the "Company") is pleased to announce that the drilling operations for the AND-5 well, in partnership with Azevedo & Travassos Energia ("ATE"), located in the Andorinha Field, Potiguar Basin, Rio Grande do Norte, were successfully concluded.","length":375,"tagName":"p"},{"type":"image","alt":"Petro-Victory Energy Corp. Logo (CNW Group/Petro-Victory Energy Corp.)","displaySize":"","headline":null,"caption":"Petro-Victory Energy Corp. Logo (CNW Group/Petro-Victory Energy Corp.)","className":"","disableSlideshowImg":false,"size":{"original":{"width":1280,"height":720,"url":"https://mma.prnewswire.com/media/2727227/Petro_Victory_Energy_Corp__Petro_Victory_Energy_provides_update.jpg"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/CzBweTVibZMLHm9VjlxYJA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTU0MDtjZj13ZWJw/https://mma.prnewswire.com/media/2727227/Petro_Victory_Energy_Corp__Petro_Victory_Energy_provides_update.jpg","width":960,"height":540},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/bp3Ue.V71KKT9Q9VeG5Bmw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTI0MDA7aD0xMzUwO2NmPXdlYnA-/https://mma.prnewswire.com/media/2727227/Petro_Victory_Energy_Corp__Petro_Victory_Energy_provides_update.jpg","width":1200,"height":675}},"href":"https://mma.prnewswire.com/media/2727227/Petro_Victory_Energy_Corp__Petro_Victory_Energy_provides_update.html","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"Highlights","length":10,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Drilling Operations: Drilling began on June 25 and concluded on July 5, reaching a total depth of 1,165 meters through sedimentary and basement rock layers.","length":161,"tagName":"p"}]},{"val":[{"type":"text","content":"Technical Execution: The operation utilized the Drake-2 onshore hydraulic rig, with wireline logging by Halliburton and successful installation of 7" nominal production casing.","length":186,"tagName":"p"}]},{"val":[{"type":"text","content":"Reservoir Findings: Petrophysical analysis identified 13 meters of net pay across four oil-bearing intervals using a 3,500-ppm salinity cut-off.","length":149,"tagName":"p"}]},{"val":[{"type":"text","content":"Next Steps: The Company will mobilize...