Business
Aya Gold & Silver Files Preliminary Economic Assessment Technical Report for Boumadine Project
MONTREAL, Dec. 18, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce that it has...
About this update from Aya Gold & Silver Inc.
[{"type":"image","alt":"Aya Gold & Silver Inc.","displaySize":"","headline":null,"caption":"Aya Gold & Silver Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":206,"url":"https://media.zenfs.com/en/globenewswire.com/22bf3cd69361731ab31df799db77987f"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/mBND8udDFtFdWVu6IIWvsQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTI4ODtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/22bf3cd69361731ab31df799db77987f","width":300,"height":206}},"lazy":false},{"type":"text","content":"MONTREAL, Dec. 18, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce that it has filed a technical report presenting the Preliminary Economic Assessment ("PEA") for the Boumadine Polymetallic Project (the “Project” or “Boumadine”), located in the Kingdom of Morocco, with an effective date of November 4, 2025 (the “Report”). The PEA was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) by independent Qualified Persons, notably Lycopodium Minerals Canada Ltd and WSP Canada Inc. All financial figures in this press release are expressed in United States dollars, unless otherwise noted. The results of the PEA were reported in Aya’s news release dated November 4, 2025, and there are no material differences between the Report and the results discussed in this news release.","length":931,"tagName":"p"},{"type":"text","content":"PEA Highlights ","length":14,"tagName":"p"},{"type":"text","content":"Boumadine is Aya’s development-stage polymetallic project. The PEA outlines a district-scale project with a flexible open-pit and underground mine plan and a conventional flotation plant producing three payable concentrates (zinc, lead and pyrite), with revenues largely driven by precious metals, and a mine life (“LOM”) estimated at 11 years.","length":344,"tagName":"p"},{"type":"text","content":"Project Highlights ","length":18,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Post-tax (Base Case1): NPV5% of $1.5B, 47% IRR, 2.1-year payback.","length":65,"tagName":"p"}]},{"val":[{"type":"text","content":"Post-tax (Spot Price2): NPV5% of $3....