Business

Awalé Hits 3.7 g/t Gold and 0.85% Copper (4.2 g/t AuEq.) over 10 Metres within 1.9 g/t Gold and 0.57% Copper over 42 Metres in Deep Drilling at BBM

Highlights Broad gold-copper mineralization intersected, supporting the emerging underground ...

articleAwale Resources LimitedMarch 16, 20263/company/awale-resources-ltd/news/awalandxe9-hits-37-gt-gold-and-085percent-copper-42-gt-aueq-over-10-metres-within-19-gt-gold-and-057percent-copper-over-42-metres-in-deep-drilling-at-bbm
Awalé Hits 3.7 g/t Gold and 0.85% Copper (4.2 g/t AuEq.) over 10 Metres within 1.9 g/t Gold and 0.57% Copper over 42 Metres in Deep Drilling at BBM

About this update from Awale Resources Limited

[{"type":"text","content":"Awalé Hits 3.7 g/t Gold and 0.85% Copper (4.2 g/t AuEq.) over 10 Metres within 1.9 g/t Gold and 0.57% Copper over 42 Metres in Deep Drilling at BBMHighlightsBroad gold-copper mineralization intersected, supporting the emerging underground potential at BBM.Results include*:2.4 g/t gold equivalent (\"AuEq.\") over 42m (42m @ 1.9 g/t gold and 0.57% copper) from 570m, including 4.2 g/t AuEq. over 10m (10m @ 3.7 g/t gold and 0.85% copper) from 600m (BBDD-21)2.2 g/t AuEq. over 31m (31m @ 1.7 g/t gold and 0.57% copper) from 654m, including 3.5 g/t AuEq. over 15m (15m @ 2.7 g/t gold and 0.9% copper) from 658m (BBDD-22)Step-out hole BBDD-27 returned 34m at 1.3 g/t AuEq. from 326m, supporting strike extension beyond the current MRE area and reinforcing the potential for a second parallel plunging shoot, with similar width and tenor to hole OEDD-93.Awalé is gaining confidence that the high-grade plunge at BBM continues to extend at depth, with potential for additional parallel zones.Mineral Resource Estimate targeted for Q2 2026, with incoming assays strengthening confidence in the scale and continuity of the BBM gold-copper system.*All AuEq. grades calculated assuming 80% metallurgical recovery for all metals.Toronto, Ontario--(Newsfile Corp. - March 16, 2026) - Awalé Resources Limited (TSXV: ARIC) (OTCQX: AWLRF) (FSE: 2F60) (\"Awalé\" or the \"Company\") is pleased to report additional assay results from its deep drilling at the BBM gold-copper discovery within the Odienné Project (\"Odienné\" or the \"Project\") in Côte d'Ivoire.This drilling forms part of an 11-hole, 7,000-metre step-down and step-out program designed to test the down-plunge and northwest (NW) extension of BBM's higher-grade core and evaluate its underground potential down to an initial vertical depth of 600m. Assays for the remaining three holes are pending (see plan map and long section in Figures 2 and 3).\"There is confidence that the high-grade plunge at BBM extends at depth, with potential for additional parallel zones,\" stated Andrew Chubb, President and CEO of Awalé Resources.\"Results from the deep drilling program demonstrate that the BBM system remains strong at depth and has the potential to add meaningful scale to our initial Mineral Resource Estimate targeted for early Q2. Additionally, we are encouraged to see sha...

More updates from Awale Resources Limited