Business

Awalé Hits 20 g/t Gold over 29m at the Charger Prospect, Odienné Project

HIGHLIGHTS 20 g/t gold over 29m, 580 gram meters gold from 149m downhole in OEDD-88 Includ...

articleAwale Resources LimitedJuly 31, 20243/company/awale-resources-ltd/news/awalandxe9-hits-20-gt-gold-over-29m-at-the-charger-prospect-odiennandxe9-project
Awalé Hits 20 g/t Gold over 29m at the Charger Prospect, Odienné Project

About this update from Awale Resources Limited

[{"type":"text","content":"\nAwalé Hits 20 g/t Gold over 29m at the Charger Prospect, Odienné ProjectHIGHLIGHTS20 g/t gold over 29m, 580 gram meters gold from 149m downhole in OEDD-88Including 39.5 g/t gold over 8m from 149m downholeOEDD-88's mineralization is well distributed across the reported intersection without any significant nugget effect Mineralization is 50m SSW of previously reported 46 g/t gold over 32m in OEDD-83 Drilling confirms these breccia zones are linked to OEDD-83 mineralization, indicating potential for increased high-grade gold volume with further drillingThree holes of the first five holes reported from Charger have intercepted the target breccia zone, which also included:70m @ 1.2 g/t gold from 143m in OEDD-84 and21m @ 1.7 g/t Au from 177m and 10m @7.8 g/t Au from 202m in OEDD-85Vancouver, British Columbia--(Newsfile Corp. - July 31, 2024) - Awalé Resources Limited (TSXV: ARIC) (the \"Company\" or \"Awalé\") is delighted to report further outstanding assay results of 20 g/t gold over 29 meters from follow up drilling to the previously reported 45.7 g/t gold over 32m in hole OEDD-83 at the Odienné Project.Andrew Chubb, CEO of Awale Resources, commented today,\"Follow up drilling at Charger has confirmed continuity of outstanding high grade breccia mineralization at Charger. Three of the five holes drilled testing the breccia's western extensions have successfully demonstrated a west by southwest extension and plunge to the mineralization. We look forward to continuing to drill test this high grade target. We also anticipate more exciting results from the successful 6,897m drill program completed over the BBM and Charger targets in the coming months ahead. Awalé continues to build the potential of the Odienné project to be a world-class mine camp in Cote d'Ivoire. As I have mentioned before, the harder we press at Odienné, the more it gives back, and we're only just scratching the surface.\"Like OEDD-83, mineralization in OEDD-88 consistently has a high grade throughout the reported interval. Table 1 shows each 1-metre assay from the reported interval in OEDD-88, confirming consistent and robust mineralization. True widths of the reported mineralization are interpred to be approximately 70% of the downhole interval. We look forward to recommencing drilling after the wet season abates with a fu...

More updates from Awale Resources Limited