Business

Avino Silver & Gold Mines Completes A Further 17 Holes On Its Oxide Tailings Project

Including 0.79 Au g/t over 10.5 Metres – Oxide Zone VANCOUVER, BC, May 24, 2022 /CNW/ - Avino Silver & Gold Mines Ltd. (TSX: ASM) (NYSE American: ASM) (FSE: GV6

articleAvino Silver & Gold Mines Ltd.May 24, 20224/company/avino-silver-and-gold-mines-ltd/news/avino-silver-and-gold-mines-completes-a-further-17-holes-on-its-oxide-tailings-project
Avino Silver & Gold Mines Completes A Further 17 Holes On Its Oxide Tailings Project

About this update from Avino Silver & Gold Mines Ltd.

[{"type":"text","content":" Including 0.79 Au g/t over 10.5 Metres – Oxide Zone VANCOUVER, BC, May 24, 2022 /CNW/ - Avino Silver & Gold Mines Ltd. (TSX: ASM) (NYSE American: ASM) (FSE: GV6) (\"Avino\" or \"the Company\") is pleased to announce drill results from the Oxide Tailings (\"TSF #1\") Project that sits within our tailings storage facility #1 (#TSF#1) on the Avino property.  The 2022 drill program included 17 drill holes for a total of 209 metres of drilling. The drilling follows up the 2021 drill program, the results of which were released on April 7, 2022 and can be viewed on our website. The drill holes were added to step out from the current known footprint of the historic oxide tailings deposit to capture the total tailings resource. As mentioned in the previous news release, a comprehensive sampling program is underway to collect samples for an upcoming metallurgical testing program. Once completed and assuming results are positive, the existing PEA will be used as the framework for an updated study with the intention of advancing the project to Pre-Feasibility Study level. The drill results are located below including the total meters drilled:   SULPHIDE ZONE OXIDE ZONE - RECENT N° HOLE ID DEPTH (m) Au (g/t) Ag (g/t) DEPTH (m) Au (g/t) Ag (g/t) 1 PJ-22-01 6.00 0.24 29       2 PJ-22-02 6.00 0.21 26       3 PJ-22-03 9.00 0.22 24       4 PJ-22-04 9.00 0.28 32       5 PJ-22-05       9.00 0.38 42 6 PJ-22-06       10.30 0.46 37 7 PJ-22-07       10.50 0.38 39 8 PJ-22-08 1.50 0.20 20 7.50 0.46 50 9 PJ-22-09 3.00 0.36 34 7.50 0.36 34 10 PJ-22-10 3.00 0.43 44 6.00 0.34 42 11 PJ-22-11 4.50 0.35 38 4.50 0.41 44 12 PJ-22-12 7.50 0.22 23 1.50 0.35 39 13 PJ-22-13 4.50 0.40 29       14 PJ-22-14 13.50 0.53 39 7.50 0.73 53 15 PJ-22-14-A 13.50 0.39 28 10.50 0.79 42 16 PJ-22-15 7.50 0.33 29 10.50 0.52 34 17 PJ-22-16 1.50 0.28 25 6.00 0.40 39 Total Metres and Average Grade 90 0.34 30 91 0.49 41 As the holes are drilled vertically the mineralization represents true width (depth) \"These results highlight the continuity of the tailings grade beyond the previous known deposition footprint,\" said David Wolfin, President and CEO. \"The gold grade in the oxide portion of the recent holes is encouraging and given the distance of the st...

More updates from Avino Silver & Gold Mines Ltd.