Business

Avino Plans 8,000 Metre Drill Program at Bralorne

Avino Plans 8,000 Metre Drill Program at Bralorne Canada NewsWire VANCOUVER, Dec...

articleAvino Silver & Gold Mines Ltd.December 11, 20175/company/avino-silver-and-gold-mines-ltd/news/avino-plans-8000-metre-drill-program-at-bralorne
Avino Plans 8,000 Metre Drill Program at Bralorne

About this update from Avino Silver & Gold Mines Ltd.

[{"type":"text","content":"\n\n\n\nAvino Plans 8,000 Metre Drill Program at Bralorne\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prnml40{\nMARGIN-LEFT:3.33em\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, Dec. 11, 2017\n\n\n\nNYSE-American: ASMTSX-V: ASMFSE: GV6  \n\n\n\nVANCOUVER, Dec. 11, 2017 /CNW/ - Avino Silver & Gold Mines Ltd. (TSX.V: ASM, NYSE-American: ASM, FSE: GV6; \"Avino\" or \"the Company\") is pleased to announce that plans have been finalised for an 8,000 metre drill program to commence early January, 2018, at its Bralorne Gold Mine located near Gold Bridge, British Columbia.\n\nOn November 14, 2017, the Company announced the receipt of an approved Permit Amendment to the Mines Act Permit M207, see news release, http://www.avino.com/i/pdf/nr/2017-11-14-nr-asm.pdf. The area of drilling is within the recently approved Permit Amendment, with drilling to be completed under Deemed Authorization. \n\nThe program will consist of 8,000 metres of drilling, and will focus on 9 gold-bearing veins containing existing resources as defined in the NI 43-101 Updated Resource Estimate completed in October, 2016. This program is designed to delineate additional resources above the 800 level in the vicinity of previously reported gold resources. The program has been designed by Bralorne's independent consultant with the assistance of Bralorne geologists. This program will also include two geotechnical holes to provide information for the engineering design of the proposed new tunnel on the 800 level.\n\nThis drill program will be aimed at both identifying additional resources and increasing the confidence in existing resources, in advance of a revised resource update.\n\n\"I am very pleased to commence this planned drill program. We have been focused on returning this historical gold mine into production since acquiring the Bralorne Gold Mine in 2014. This drill program and the receipt of the Amended Permit in November, are important steps that bring us closer to achieving our plans for the Bralorne Gold Mine.\"\n\n- David Wolfin, President, CE...

More updates from Avino Silver & Gold Mines Ltd.