Business

Aventis Energy Announces Filing of NI 43-101 Technical Report for Sting Copper Project in Newfoundland & Labrador

VANCOUVER, British Columbia, April 01, 2026 (GLOBE NEWSWIRE) -- Aventis Energy Inc. (“Aventis” or the “Company”) (CSE: AVE | FRA: C0O | OTC: VBAMF), is pleased to announce that it has filed a technical report (the “Report”) dated December 24, 2025, with an effective date of December 9, 2025, entitled “Technical Report on the Sting Copper Property, Newfoundland And Labrador, Canada” prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”)

articleAventis Energy IncApril 1, 20265/company/aventis-energy-inc/news/aventis-energy-announces-filing-of-ni-43-101-technical-report-for-sting-copper-project-in-newfoundland-and-labrador
Aventis Energy Announces Filing of NI 43-101 Technical Report for Sting Copper Project in Newfoundland & Labrador

About this update from Aventis Energy Inc

[{"type":"image","alt":"Aventis Energy Inc.","displaySize":"","headline":null,"caption":"Aventis Energy Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":157,"height":88,"url":"https://media.zenfs.com/en/globenewswire.com/475f326f8b07f9d2c036f49173a010f0"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/BjSWhZt5n_6XXXidkJFhfA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIxMDtoPTExOA--/https://media.zenfs.com/en/globenewswire.com/475f326f8b07f9d2c036f49173a010f0","width":157,"height":88}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, April 01, 2026 (GLOBE NEWSWIRE) -- Aventis Energy Inc. (“Aventis” or the “Company”) (CSE: AVE | FRA: C0O | OTC: VBAMF), is pleased to announce that it has filed a technical report (the “Report”) dated December 24, 2025, with an effective date of December 9, 2025, entitled “Technical Report on the Sting Copper Property, Newfoundland And Labrador, Canada” prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) on the Company’s Sting Copper Project (“Sting” or the “Project”). The Report was authored by independent Qualified Person Alexander Timofeev, PhD, P.Geo., of Dahrouge Geological Consulting. The Report is available on SEDAR+ at www.sedarplus.ca and is published on Aventis’ website at www.aventisenergy.com.","length":807,"tagName":"p"},{"type":"text","content":"Key Technical Report Recommendations","length":36,"tagName":"p"},{"type":"text","content":"Further work on the Project is recommended to advance priority target areas within the Jumbo–Red Lode and Crabb Brook claim blocks, where recent exploration has identified anomalous geochemical and geophysical signatures prospective for volcanogenic massive sulfide (“VMS”) style copper-zinc mineralization. At Crabb Brook, key targets including Buck Head Brook, the headwaters area, and an eastern chargeability anomaly identified from VTEM data warrant follow-up. A Phase 1 program (the “Program”) of soil sampling and prospecting is recommended to refine these targets, followed by a ground-based IP survey to better define chargeability responses and prioritize future drill testing.","length":687,"tagName":"p"},{"type":"text","content":"Qualified Person Statement","length":26,"tagName":"p"},{"type":"text","content":"The scientific and technical information contained in this news release ...

More updates from Aventis Energy Inc

Aventis Energy Inc.the Projecttechnical reportsoil samplingThe CompanyCopper ProjectNational Instrument 43-101Qualified PersonQualified Person Alexander TimofeevStingNewfoundland And Labrador