Business
Aton Reports New Surface Sampling Results From the Retained Exploration Areas at Abu Marawat, Including 183 g/t Au From Bohlog, 125 g/t Au From Semna, and 67.4 g/t Au From Kab Amira
VANCOUVER, BC / ACCESSWIRE / June 19, 2024 / Aton Resources Inc. (TSXV:AAN) ("Aton" or the "Comp...

About this update from Aton Resources Inc.
[{"type":"text","content":"Aton Reports New Surface Sampling Results From the Retained Exploration Areas at Abu Marawat, Including 183 g/t Au From Bohlog, 125 g/t Au From Semna, and 67.4 g/t Au From Kab AmiraVANCOUVER, BC / ACCESSWIRE / June 19, 2024 / Aton Resources Inc. (TSXV:AAN) (\"Aton\" or the \"Company\") updates investors on the progress of its ongoing exploration programmes within the retained exploration areas of the Company's Abu Marawat Concession (\"Abu Marawat\" or the \"Concession\") in the Eastern Desert of Egypt, including the results of recent surface sampling at several of its regional targets.Highlights:Aton has recently undertaken further sampling and mapping programmes over several of its regional targets in the Abu Marawat Concession retained exploration areas;A total of 258 selective grab and non-selective surface channel were collected from the Black Gaharish, Bohlog, Kab Amira, Semna and Zeno prospect areas (Figure 1). A further 7 blank and duplicate QAQC samples were also submitted for analysis;38 samples were collected from the Black Gaharish prospect area, returning assays including 29.9 g/t Au and 9.46 g/t Au;7 samples were collected from the Bohlog prospect area, returning assays including 183 g/t Au and 14.65 g/t Au;112 samples were collected from the Kab Amira prospect area, returning assays including 67.4 g/t Au, 44.9 g/t Au and 29.8 g/t Au;42 samples were collected from the Semna regional prospect area, returning assays including 125 g/t Au, 36.3 g/t Au and 32.5 g/t Au;59 samples were collected from the Zeno regional prospect area, returning assays including 45.1 g/t Au, 26.9 g/t Au and 24.5 g/t Au;The phase 2 diamond drilling programme has been completed at the Semna prospect, with 28 holes completed for a total drilled meterage of 4,701m. The Company has also now completed a programme of surface sampling and started a c. 3,000m programme of shallow and horizontal diamond drilling at the Abu Marawat deposit, designed to test a highly prospective and previously undrilled area.\"This is another set of excellent surface sampling results, which yet again demonstrate the potential of the Abu Marawat Concession, including the newly identified Kab Amira area, and the very widespread development of gold mineralisation at surface across the areas that have been retained for further exploration\" said Tonno Vahk, CEO. \"We are pr...