Business
Roxmark reports encouraging results from drilling on gold veins at Nortoba-Tyson molybdenum/gold property
TORONTO, Sept. 30 /CNW Telbec/ - Roxmark Mines Limited (TSXV - RMK) today announced that its seco...

About this update from Atlas Salt Inc
[{"type":"text","content":"\n\n\n\nTORONTO, Sept. 30 /CNW Telbec/ - Roxmark Mines Limited (TSXV - RMK) today\nannounced that its second surface diamond drilling program for the year has\nbeen completed on gold veins at its Nortoba-Tyson moly-gold property,\nencountering gold mineralization in every hole drilled along the strike\nlength.\n\n\nA total of 1,358 metres was drilled to delineate the gold mineralization\nof Veins No.1, 1A and 2. Following the completion of mechanical stripping,\ngeological mapping and channel sampling of Veins No.1 and 2, Vein No.2 was\nexposed over a strike length of at least 350 metres and Vein No.1 was exposed\nfor 150 metres. Channel samples returned gold values up to 13.3 g.Au/t over\n0.30 metres.\n\n\nAlthough drilling was done on wide spacing, an area of interest\nencountered gold values up to 16.6 g.Au/t over a strike length of 110 metres.\nThe following table provides significant assays received:\n\n\n-------------------------------------------------------------------------\n Length AU\nHole-ID Dip From To (m) Zone (g/t)\n-------------------------------------------------------------------------\nNT08 - 01 -55 80.50 81.00 0.50 Vein No. 2 10.10\n-------------------------------------------------------------------------\nNT08 - 02 -55 51.30 51.60 0.30 Vein No. 2 8.79\n 51.60 51.90 0.30 1.54\n-------------------------------------------------------------------------\nNT08 - 03 -70 47.90 48.20 0.30 Vein No. 2 6.84\n 48.20 48.60 0.40 16.60\n-------------------------------------------------------------------------\nNT08 - 08 -65 24.30 24.80 0.50 Vein No. 1 4.36\n-------------------------------------------------------------------------\nNT08 - 13 -45 27.50 28.00 0.50 Vein No. 2 5.29\n-------------------------------------------------------------------------\nNT08 - 15 -45 56.00 56.70 0.70 Vein No. 2 9.30\n-------------------------------------------------------------------------\nNT08 - 17 -45 36.90 37.40 0.50 Vein No. 1 4.11\n-------------------------------------------------------------------------\nNOTE: True widths estimated at approximately 70% of intersection width\n\n\nAdditional drilling is planned to outline the extent of gold\nmineralization along the strike length. The drilling program is being\nsupervised by Peter Bevan, P. Eng., the Qualified Person for the information\ncontained in this news release and within the mean...