Business

Atha Energy Final Assays From 2025 Angilak Exploration Program Confirm High-Grade Discoveries at KU and Mushroom Lake Targets - Grades up to 1.56% U3O8 and 1.10% U3O8, Respectively, and Expansion of Mineralization at the Lac 50 Deposit With Grades up to 1.47% U3O8

HIGHLIGHTS Final assays from the 2025 Angilak Exploration Program at the Company's 100%-owne...

articleAtha Energy Corp.February 26, 20265/company/atha-energy-corp/news/atha-energy-final-assays-from-2025-angilak-exploration-program-confirm-high-grade-discoveries-at-ku-and-mushroom-lake-targets-grades-up-to-156percent-u3o8-and-110percent-u3o8-respectively-and-expansion-of-mineralization-at-the-lac-50-deposit-with-grades-up-to-147percent-u3o8
Atha Energy Final Assays From 2025 Angilak Exploration Program Confirm High-Grade Discoveries at KU and Mushroom Lake Targets - Grades up to 1.56% U3O8 and 1.10% U3O8, Respectively, and Expansion of Mineralization at the Lac 50 Deposit With Grades up to 1.47% U3O8

About this update from Atha Energy Corp.

[{"type":"text","content":"Atha Energy Final Assays From 2025 Angilak Exploration Program Confirm High-Grade Discoveries at KU and Mushroom Lake Targets - Grades up to 1.56% U3O8 and 1.10% U3O8, Respectively, and Expansion of Mineralization at the Lac 50 Deposit With Grades up to 1.47% U3O8HIGHLIGHTSFinal assays from the 2025 Angilak Exploration Program at the Company's 100%-owned Angilak Uranium Project, located in Nunavut, Canada (Figure 1), confirm high-grade uranium mineralization at the KU and Mushroom Lake Targets, as well as expansion of the J4/Ray zone mineralization beyond the 2024 Lac 50 Deposit Exploration Target area (Figure 2);Recently completed 3D MMT Inversion modeling (\"3D Inversion\") across the Angilak Uranium Project - the 3D Inversion led to the successful discoveries across the Mineralized RIB Corridor, including the RIB North Discovery (See News Release) - highlighting an abundance of additional highly prospective exploration targets along the Mineralized RIB, Lac 50 Deposit, and KU-Nine Iron Corridors (Figure 2);KU Discovery (KU-Nine Iron Corridor)Located within the 14 km long KU-Nine Iron Corridor, the Company completed a total of six diamond drillholes as part of the successful 2025 Angilak Exploration Program (the \"Program\"), intersected uranium mineralization on five of six holes;The widespread uranium mineralization identified at the KU Discovery area indicates a much larger mineralizing system is at play, vectoring towards high-priority targets identified by the 3D Inversion;The Program tested a prominent stacked EM and gravity anomaly located within the Angikuni Basin at the western margin of the KU-Nine Iron Corridor, resulting in the intersection of widespread uranium mineralization within the sandstone. After the completion of the 2025 Angilak Exploration Drill Program, the recent 3D Inversion has identified several large highly prospective anomalies along trend from the KU Discovery;Drilling results are highlighted by:Drillhole KU-DD-001 (Figure 3), which intersected total composite mineralization1 of 15.1 m, from 85.0 m down to a depth of 502.6 m. This includes a shallow interval of uranium mineralization from 85.0 m to 87.0 m containing high-grade mineralization2 of 1.56% U3O8 over 0.5 m;Drillholes KU-DD-003 (Figure 4) & ‘004 (Figure 5), both drilled along strike to the north of ‘001, intersected wi...

More updates from Atha Energy Corp.