Business

ATAC Announces 2020 Exploration Program at its Rackla Gold Project

ATAC Announces 2020 Exploration Program at its Rackla Gold Project Canada NewsWire...

articleAterra Metals Inc.March 2, 20204/company/aterra-metals-inc/news/atac-announces-2020-exploration-program-at-its-rackla-gold-project
ATAC Announces 2020 Exploration Program at its Rackla Gold Project

About this update from Aterra Metals Inc.

[{"type":"text","content":"\n\n\n\nATAC Announces 2020 Exploration Program at its Rackla Gold Project\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, March 2, 2020\n\n\n\nVANCOUVER, March 2, 2020 /CNW/ - ATAC Resources Ltd. (TSX-V: ATC) (\"ATAC\") is pleased to announce the phase one exploration program at its Rau Project, located at the western end of its 1,700 km2 Rackla Gold Property in east-central Yukon.\n\n \n \n\n \nThe phase one program will prepare the 11.5 km2 Airstrip target for a proposed phase two, mid-season drill program. Drill target refinement will focus on areas where limited previous rotary air blast (\"RAB\") drilling in multiple short holes bottomed in significant gold mineralization. Work to be completed concurrently with the initial Airstrip program will focus on advancing other regional exploration targets and refining drill targets at the Tiger Gold Deposit . \nProposed 2020 Phase One Exploration Objectives:\nExcavator trenching, mapping and prospecting throughout the Airstrip target, which hosts the largest gold-in-soil anomaly (11.5 km2) on the ~1,700 km2 Rackla Gold Property;Focused work at the Airstrip target near RAB holes ASR-16-006 and ASR-16-004, which ended in 1.43 g/t gold over 13.71 m and 0.66 g/t gold over 22.86 m, respectively;RAB drilling, trenching, prospecting, hand pitting and mapping on regional early-stage geochemical targets, including the Val target, where 2019 prospecting returned a highlight sample of 11,663 g/t silver, 76.4% lead, and 2.59% copper; andRegional soil sampling of underexplored portions of the property.\"The Rau Project contains an exceptional portfolio of precious and base metals targets, anchored by the recently updated economics of our high-grade Tiger Gold Deposit,\" commented President and CEO Graham Downs. \"Fieldwork in 2019 upgraded the Airstrip target to priority status for 2020. The presence of shallow gold mineralization coupled with a potential bulk-tonnage target based on the the size of the geochemical anomaly, has resulted in an exciting ex...

More updates from Aterra Metals Inc.