Business

metallurgical tests confirm positive results

metallurgical tests confirm positive results.

articleAsiamet Resources LimitedFebruary 28, 20184/company/asiamet-resources-limited/news/metallurgical-tests-confirm-positive-results
metallurgical tests confirm positive results

About this update from Asiamet Resources Limited

[{"type":"text","content":"\n \nRNS Number : 1917G Asiamet Resources Limited 28 February 2018  \n\n \n \nFor Immediate Release                            London AIM\n \n28 February 2018                                       Symbol: ARS\n            \n                                                                \n \n \nBKM Copper Project - Long Column metallurgical tests confirm previous positive results \n \nAsiamet Resources Limited (\"ARS\" or the \"Company\") is pleased to announce positive results from the column leach test work being undertaken as part of the Bankable Feasibility study on the Beruang Kanan Main (\"BKM\") copper deposit.  \nFollowing a 270-day leach cycle, metallurgical results obtained from the long column (6-metre) programme, support the results previously reported in the short column test work (refer ARS news release 19 December 2017).  Results confirm the design basis being utilised for the leaching, solvent extraction and electrowinning facilities and provide critical process plant design inputs for the BKM feasibility study.\nKey highlights include:\n·    Soluble copper recoveries from the coarse crush size (P80=19mm) ranged from 72% to 81% (%Cusol) for the dominant material types defined at BKM.  These recoveries represent a 4% improvement, on average, over the recoveries obtained from the short column programme.\n·   The long column results confirm the expectation that utilising a finer crush size will deliver recoveries of 80% to 85% (%Cusol) for the dominant material types, as observed in the short column programme.\n·   The majority of the soluble copper, ...

More updates from Asiamet Resources Limited