Business

Intersects 115.5m at 1% Cu at BK44 Zone

Intersects 115.5m at 1% Cu at BK44 Zone.

articleAsiamet Resources LimitedNovember 29, 20175/company/asiamet-resources-limited/news/intersects-1155m-at-1percent-cu-at-bk44-zone
Intersects 115.5m at 1% Cu at BK44 Zone

About this update from Asiamet Resources Limited

[{"type":"text","content":"\n \nRNS Number : 8184X Asiamet Resources Limited 29 November 2017  \n\n \n \nFor Immediate Release                               London AIM\n \n29 November 2017                                    Symbol: ARS\n            \n                                                                \n \n \n \nAsiamet Completes Metallurgy Drill Holes, Intersects 115.5m at 1% Cu at BK44 Zone\n \nMetallurgy drill holes at BKM Copper Project (\"BKM\") have intersected near surface high-grade copper mineralisation at BK44 and BK58 Zones. These results further increase the Company's confidence in the BKM resource and support a potential strategy in the ongoing Feasibility Study to develop the first stage of mining in higher grade, higher recovery copper mineralisation.  \nThe 2017 drilling for the metallurgical test work has been finalised, a total of nine holes for 764 metres of diamond core drilling were completed (Figure 1).   \nResult highlights from eight of the nine holes are reported below.    \nBKM32230-01    115.5m at 1.01% Copper (from 2 metres) and hole terminated in 2.56% Cu\nIncluding 13.0m at 1.81% Copper (from 25.0 metres)\nIncluding 8.0m at 1.97% Copper (from 47.0 metres)\nIncluding 17.0m at 1.24% Copper (from 86.0 metres)\nIncluding 9.0m at 1.89% Copper (from 108.5 metres)\nBKM31720-01    3.0m at 1.42% Copper (from 9.0 metres)\n8.0m at 2.15% Copper (from 15.0 metres)\nBKM31780-01    59.0m at 0.68% Copper (from 4.0 metres)\nIncluding 14.0m at 0.85% Copper (from 5.0 metres)\nIncluding 8.0m at 1.18% Copper (from 39.0 metres)\nBKM32080-01    4....

More updates from Asiamet Resources Limited