Business
BKZ Drilling Intersects High Grade Mineralisation
BKZ Drilling Intersects High Grade Mineralisation.

About this update from Asiamet Resources Limited
[{"type":"text","content":"\n \nRNS Number : 1600I Asiamet Resources Limited 19 March 2018 \n\n \n \nFor Immediate Release London AIM\n \n19 March 2018 Symbol: ARS\n \n \n \n \nAsiamet BKZ Resource Drilling Continues to Intersect High Grade Mineralisation\n \n \nAsiamet Resources Limited (\"ARS\" or the \"Company\") is pleased to report that ongoing Resource delineation drilling at the BKZ prospect (\"BKZ\") continues to intersect high-grade polymetallic and copper - silver mineralisation as predicted. The BKZ prospect is located in Central Kalimantan (Indonesia) on the Kalimantan Surya Kencana (\"KSK\") 6th Generation Contract of Work (\"CoW\"), less than 800 metres from the BKM copper project which is at BFS stage. \nHighlights of recent results include:\n· Broad intervals of high-grade massive sulphide mineralisation in the upper polymetallic zone, including 17.0m at 11.4% Zinc, 6.0% Lead and 383g/t Silver and 30.0m at 6.0% Zinc, 4.0% Lead and 62g/t Silver \n· Broad interval of high-grade copper-silver mineralisation in the lower zone, including 29.5m at 1.86% Cu and 50g/t Ag\n· Assay results confirm up to 30.7% zinc, 17.7% lead, 158g/t silver over 1-metre sample intervals in the polymetallic zone and up to 6.6% copper over 1-metre sample intervals in the interpreted \"Feeder Structure\" in the Lower Zone\n· A Maiden Resource estimate for both mineralised domains at the BKZ deposit is being pr...