Business
Asiamet Feasibility Drilling Hits More High Gra...
Asiamet Feasibility Drilling Hits More High Gra....

About this update from Asiamet Resources Limited
[{"type":"text","content":"\n Asiamet Feasibility Drilling Hits More High Grade Copper at BKMAsiamet Resources Limited (\"ARS\" or the \"Company\") is pleased to report that Resource evaluation drilling as part of feasibility studies on the Beruang Kanan Main (\"BKM\") copper deposit in Central Kalimantan, Indonesia continues to confirm excellent continuity of high grade copper mineralization in the BK044 Zone. A total 70 holes for 7030 meters of diamond core drilling have now been completed and two holes are currently in progress. The results from ten holes drilled in the northern part of the BKM deposit are reported below. A further 48 holes/3970 meters are planned and a third drill rig has recently been mobilized to ensure completion of the feasibility study resource evaluation program in Q1,2017. An updated Resource estimate incorporating all of the 2016-2017 drilling will be prepared for release shortly thereafter.Better results from the most recent drilling include:BKM32600-05 4.8 meters at 1.07% Cu (from 21.3 meters) 26.85 meters at 2.34% Cu (from 34.15 meters)Including 3.0 meters at 3.38% Cu (from 38.0 meters) Including 16.0 meters at 3.02% Cu (from 44.0 meters)BKM32600-06 14.0 meters at 0.74% Cu (from 34.0 meters)Including 4.0 meters at 1.53% Cu (from 36.0 meters)BKM32550-08 4.35 meters at 4.93% Cu (from 3.00 meters)Including 2.0 meters at 8.97% Cu (from 4.0 meters) 33.5 meters at 0.75% Cu (from 34.5 meters)BKM32100-02 4.0 meters at 1.87% Cu (from 2.00 meters) 2.0 meters at 1.36% Cu (from 17.00 meters)BKM32150-05 30.0 meters at 0.75% Cu (from 9.00 meters)Including 5.0 meters at 1.73% Cu (from 24.0 meters) Including 5.0 meters at 1.03% Cu (from 34.0 meters)Holes B...