Business
Asiamet Extends High Grade Copper Mineralisatio...
Asiamet Extends High Grade Copper Mineralisatio....

About this update from Asiamet Resources Limited
[{"type":"text","content":"\n \nAsiamet Resources Ltd. (ARS)Asiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit13-Nov-2017 / 09:38 GMT/BSTDissemination of a Regulatory Announcement that contains inside information according to REGULATION (EU) No 596/2014 (MAR), transmitted by EQS Group.The issuer is solely responsible for the content of this announcement.\n\n For Immediate Release London AIM\n\n \n\n13 November 2017 Symbol: ARS\n\n \n\n  \n\nAsiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit\n\n \n\n \n\nAsiamet Resources Limited (\"ARS\" or the \"Company\") is pleased to report that ongoing exploration drilling at the BKZ Polymetallic (\"BKZ\") prospect located on its Kalimantan Surya Kencana (\"KSK\") 6th Generation Contract of Work (\"CoW\"), in Central Kalimantan, Indonesia continues to intersect, near surface high grade base and precious metal rich mineralisation. Highlights to date include:\n\nBKZ contains massive sulphide or vein style mineralisation that is confirmed over a strike length of 225m, is up to 110m in east-west dimension and has a variable interpreted true thickness of 8m to 39m. \n \n\nThree holes have intersected high grade copper mineralisation immediately beneath the high grade polymetallic Zn-Pb-Cu-Ag-Au mineralisation, confirming a strike length of at least 110m and a true thickness of up to 50m. Copper mineralisation remains open to the south, east, west and down-dip.\n \n\nHigh grade copper-silver mineralisation is interpreted to occur within a primary feeder structure to the BKZ polymetallic mineralisation, with up to 11.8% copper and 415g/t silver reported over 1-metre sample intervals. \n \n\nThe copper mineralisation at BKZ is potentially controlled by the same major structure that controls the location of mineralisation at the BKM Copper Project to the south, and as such indicates potential for continuity of structurally controlled copper mineralisation over 800 metres of strike between BKZ and BKM.\n \n\nHighlights of the latest batch of drill results received include: \n\nBKZ33600-01 4.0m at 9.1% zinc, 4.0% lead, 60.4g/t silver and 0.21g/t gold (from                  ...