Business

30m of 8.3% Zinc at BKZ and Extends High Grade ...

30m of 8.3% Zinc at BKZ and Extends High Grade ....

articleAsiamet Resources LimitedOctober 18, 20174/company/asiamet-resources-limited/news/30m-of-83percent-zinc-at-bkz-and-extends-high-grade
30m of 8.3% Zinc at BKZ and Extends High Grade ...

About this update from Asiamet Resources Limited

[{"type":"text","content":"\n \nAsiamet Resources Ltd. (ARS)30m of 8.3% Zinc at BKZ and Extends High Grade Polymetallic Discovery18-Oct-2017 / 07:00 GMT/BSTDissemination of a Regulatory Announcement that contains inside information according to REGULATION (EU) No 596/2014 (MAR), transmitted by EQS Group.The issuer is solely responsible for the content of this announcement.\n\nFor Immediate Release London AIM\n\n \n\nOctober 18, 2017 Symbol: ARS\n\n \n\n \n\n \n\n \n\nAsiamet Intersects 30m of 8.3% Zinc at BKZ and Extends High Grade Polymetallic Discovery \n\n \n\n \n\nAsiamet Resources Limited (\"ARS\" or the \"Company\") is pleased to report that follow up scout drilling at the BKZ Polymetallic (\"BKZ\") prospect located on its Kalimantan Surya Kencana (\"KSK\") 6th Generation Contract of Work (\"CoW\"), in Central Kalimantan, Indonesia continues to intersect further intervals of thick, near-surface high-grade base and precious metal-rich mineralisation. Highlights to date include:\n\nAll eight holes (790 metres (\"m\")) drilled to test depth extensions of a massive sulphide zone which outcrops over an area of 150m x 100m have intersected mineralisation and the deposit remains open laterally and at depth.\n \n\nAssay results reported in this release now confirm at least 100m of continuity to the thick, high-grade polymetallic mineralisation. \n \n\nBKZ is located very close (approx. 800m north) to the Company's feasibility stage BKM Copper Project (\"BKM\") and within 150m of the main access road leading to BKM. \n \n\nHighlights of the latest batch of drill results received include: \n\n\n BKZ33700-03\n \n \n 30.0m at 8.3% zinc, 3.3% lead, 39g/t silver and 0.51g/t gold (from 14m)\n \n \n  \n \n \n Including 13.0m at 12.5% zinc, 4.7% lead, 56g/t silver, 0.58g/t gold (from 15m)\n \n \n  \n \n \n Including 3.0m at 13.2% zinc, 6.6% lead, 30g/t Silver, 0.26g/t gold (from 39m)  \n \n \n BKZ33750-01\n \n \n 8.3m at 4.0% zinc, 1.9% lead, 42g/t silver and 0.19g/t gold (from 1.3m)\n \n \n  \n \n \n 1.0m at 12.7% zinc, 4.2% lead and 27g/t silver (from 48.5m)\n \n  \n\nExtensive further drilling is still required to determine the ultimate size and geometry of the mineralisation and advance the discovery to an initial Resource. \n\nPeter Bird, Asiamet's Chief Execut...

More updates from Asiamet Resources Limited