Business

Arya Resources Ltd. (RBZ) Drills 3.5 Kilogram per Tonne (Kg. /t) Copper, 6.1 Kg. /t Nickel, and 0.247 Kg. /t Cobalt over 36.5 meters

Vancouver, British Columbia--(Newsfile Corp. - March 13, 2024) - Arya Resources Ltd. (TSXV: RBZ)...

articleArya Resources LtdMarch 13, 20243/company/arya-resources-ltd/news/arya-resources-ltd-rbz-drills-35-kilogram-per-tonne-kg-t-copper-61-kg-t-nickel-and-0247-kg-t-cobalt-over-365-meters
Arya Resources Ltd. (RBZ) Drills 3.5 Kilogram per Tonne (Kg. /t) Copper, 6.1 Kg. /t Nickel, and 0.247 Kg. /t Cobalt over 36.5 meters

About this update from Arya Resources Ltd

[{"type":"text","content":"Arya Resources Ltd. (RBZ) Drills 3.5 Kilogram per Tonne (Kg. /t) Copper, 6.1 Kg. /t Nickel, and 0.247 Kg. /t Cobalt over 36.5 metersVancouver, British Columbia--(Newsfile Corp. - March 13, 2024) - Arya Resources Ltd. (TSXV: RBZ) (\"Arya\" or the \"Company\") is pleased to announce the company has received results for its fall drill program on the company's Dunlop Ni-Cu project in northern Saskatchewan, Canada. The program consisted of 8 drill holes totalling 1045m and was completed between December 7th and 17th, 2023.Drill Hole AR 23-007 intersected, starting from 16 meters (m) :35.50 meters (m) of 0.32% Copper (Cu), 0.39% Nickel (Ni), and 161 grams/tonne (g/t) Cobalt (Co) including 0.41% Cu, 0.52% Ni and 195 g/t Co over 17 m.Drill Hole 008 intersected, starting from 18.5 m: 36.5 m of 0.35% Cu, 0.61% Ni and 247 g/t of Co including 0.64% Cu, 1.35% Ni and 518 g/t Co over 9.7 m.The project is located 37km north of La Ronge via Provincial Highway 102 and then an 8km bush road heading west to Nemeiben Lake provides excellent access. A powerline runs along Provincial Highway 102 and would provide easy access to hydro for the project site. Fall 2023 Drill Program: Dunlop Ni-Cu Project, Nemeiben LakeDrillholeUTM EUTM NElev(m)AzimuthDipAR23-0074892756130945390.70.0-55AR23-0084892756130945390.70.0-70 The drill program was designed to test favourable Nickel-Copper targets identified within the historic Dunlop Ni-Cu Zone identified at the East Zone-the mineralization showed continuity and appears to be of similar nature to the zone intersected in the historic drilling, 3-5% disseminated and blebby pyrrhotite with trace to 1% pentlandite and chalcopyrite. Locally, on a meter scale, sulphide content increases to 30%. Previous drilling in 1960-1980 identified a historical deposit totalling 18.11 million tonnes of Ni, and Cu mineralization of which 12.83 million tonnes were considered able to be mined as an open pit and the balance by underground mining. Grades ranged from 0.55% Ni - 1.46% Ni and 0.15% Cu - 0.39% Cu with assays of up to 0.35% Cr and 0.15% Co -Source Reference: SMDI#0749 Saskatchewan Mineral Database Identification Number- (see Company News Release: https://aryaresourcesltd.com/pdf/2023-03-02_NR.pdf)Haultain Uranium Property- Athabasca Basin Saskatchewan, CanadaThe company also owns early-stage uranium claims near the Athab...

More updates from Arya Resources Ltd