Business

Drilling Report

Drilling Report.

articleArkle Resources PlcJune 4, 20083/company/arkle-resources-plc/news/drilling-report-1
Drilling Report

About this update from Arkle Resources Plc

[{"type":"text","content":"\n RNS Number : 8889V Connemara Mining Company plc 04 June 2008  \n \n\n4th June 2008\n\nConnemara Mining Company PLC ('Connemara' or 'the Company')\n\nDrilling Update from Limerick Zinc Discovery\n\n\nHighlights:\n\n\n\nAs part of the follow-up drilling programme a second hole intersects significant thickness and grade of zinc and lead at Stonepark, Limerick\n\n\n\n\n\n15.35 metres of 3.25% zinc including 2.85 metres of 12.18% zinc / 0.75% lead\n\n\n\n\n\nTwo rigs continue with follow-up drilling\n\n\n\nThe directors of Connemara (AIM: CON.L), the AIM listed Irish zinc explorer are pleased to provide an update on drilling at their Stonepark zinc discovery in Limerick, Ireland following their successful 5 hole scouting programme at the end of 2007.\n\nDrilling resumed at Stonepark in February 2008 and a recent step out drill hole, (Hole TC-2638-7), located 100 metres from the initial scouting discovery hole (Hole TC-2638-4) intersected 15.35 metres of 3.25% zinc and 0.33% lead including 2.85 metres of 12.18% zinc and 0.75% lead.\n\nThe high grade zinc mineralisation and thick well-developed mineralised zones are suggestive of the presence of a large base metal mineralised system. Results of the two discovery holes,  of which drill hole TC-2638-4 was reported on in November 2007, are shown in Table 1 below.\n\nTable 1: Drill Results from Stonepark Zinc Discovery\n\n\n\n\nHole ID\n\n\nHole Angle (degrees)\n\n\nFrom (m)\n\n\nTo (m)\n\n\nThick-\nness (m)\n\n\nEstimated True Thickness (m)\n\n\nZn (%)\n\n\nPb (%)\n\n\n\n\nTC-2638-4\n\n\n-90\n\n\n372.75\n\n\n374.05\n\n\n1.30\n\n\n1.30\n\n\n6.85\n\n\n0.3\n\n\n\n\nTC-2638-4\n\n\n-90\n\n\n374.05\n\n\n376.1\n\n\n2.05\n\n\n2.05\n\n\n0.3\n\n\n<0.05\n\n\n\n\nTC-2638-4\n\n\n-90\n\n\n376.1\n\n\n380.1\n\n\n4.00\n\n\n4.00\n\n\n11.62\n\n\n3.46\n\n\n\n\n \n\n\n \n\n\nincluding:\n\n\n \n\n\n \n\n\n \n\n\n \n\n\n \n\n\n\n\nTC-2638-4\n\n\n-90\n\n\n378.95\n\n\n380.1\n\n\n1.15\n\n\n \n\n\n28.61\n\n\n4.17\n\n\n\n\n \n\n\n \n\n\n \n\n\n \n\n\n \n\n\n \n\n\n \n\n\n \n\n\n\n\nTC-2638-7\n\n\n-76\n\n\n394.85\n\n\n410.2\n\n\n15.35\n\n\n14.9\n\n\n3.25\n\n\n0.33\n\n\n\n\n \n\n\n \n\n\ninc...

More updates from Arkle Resources Plc