Business
Arizona Sonoran Reports the Southern Extension of the High-Grade Core at Parks/Salyer through Infill Drilling, including 391 m @ 0.74% Total Copper
Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF) (“ASCU” or the  ...

About this update from Arizona Sonoran Copper Co., Inc.
[{"type":"text","content":"Arizona Sonoran Reports the Southern Extension of the High-Grade Core at Parks/Salyer through Infill Drilling, including 391 m @ 0.74% Total Copper\n\n\n .bwalignc { text-align: center; list-style-position: inside }\n.bwblockalignl { margin-left: 0px; margin-right: auto }\n.bwcellpmargin { margin-bottom: 0px; margin-top: 0px }\n.bwleftsingle { border-left: solid black 1pt }\n.bwlistcircle { list-style-type: circle }\n.bwlistdisc { list-style-type: disc }\n.bwpadb3 { padding-bottom: 4px }\n.bwpadl0 { padding-left: 0px }\n.bwpadr0 { padding-right: 0px }\n.bwrightsingle { border-right: solid black 1pt }\n.bwrowaltcolor0 { background-color: #cceeff }\n.bwsinglebottom { border-bottom: solid black 1pt }\n.bwtablemarginb { margin-bottom: 10px }\n.bwtopsingle { border-top: solid black 1pt }\n.bwvertalignb { vertical-align: bottom }\n.bwvertalignm { vertical-align: middle }\n.bwvertalignt { vertical-align: top }\n.bwwidth10 { width: 10% }\n.bwwidth100 { width: 100% }\n.bwwidth13 { width: 13% }\n.bwwidth14 { width: 14% }\n.bwwidth16 { width: 16% }\n.bwwidth17 { width: 17% }\n.bwwidth18 { width: 18% }\n.bwwidth3 { width: 3% }\n.bwwidth8 { width: 8% }\n.bwwidth97 { width: 97% }\n \n\n\n\n\n Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF)\n \n (“ASCU” or the “Company”) is pleased to announce that initial Parks/Salyer infill drilling results are confirming the continuity of mineralization at tighter drill spacings, and additionally, have extended the high grade core at the Parks/Salyer copper deposit, onto the MainSpring property at the Cactus Project, in Arizona (see\n \n\n FIGURES 1-10\n \n\n ). Results from the program are in line with expectations, with a few positive outliers notably from ECM-289, ECM-299 and ECM-244. Three drill rigs are focused on mineral resource infill drilling, while a fourth rig is focused on both mineral resource infill drilling at Cactus West and providing downhole data for the geotechnical and hydrological programs necessary for the planned Pre-Feasibility Study (“2025 PFS”) expected in the second half of 2025.\n \n\n This press release features multimedia. View the full release here:\n \n https://www.businesswire.com/news/home/20250225820514/en/\n \n\n\n Additionally, Doug Bowden will be stepping down as Vice President Exploration, effective April 1, 2025. ...