Business

Arizona Metals Intersects 65.2 m at 4.0% CuEq (incl. 14.2 m at 7.3% CuEq) and 27.4 m at 2.5% CuEq (incl. 3.2 m at 7.1% CuEq) in Kay Mine Drilling

Arizona Metals Intersects 65.2 m at 4.0% CuEq (incl. 14.2 m at 7.3% CuEq) and 27.4 m at 2.5% CuEq...

articleArizona Metals CorpJuly 24, 20245/company/arizona-metals/news/arizona-metals-intersects-652-m-at-40percent-cueq-incl-142-m-at-73percent-cueq-and-274-m-at-25percent-cueq-incl-32-m-at-71percent-cueq-in-kay-mine-drilling
Arizona Metals Intersects 65.2 m at 4.0% CuEq (incl. 14.2 m at 7.3% CuEq) and 27.4 m at 2.5% CuEq (incl. 3.2 m at 7.1% CuEq) in Kay Mine Drilling

About this update from Arizona Metals Corp

[{"type":"text","content":"\n \n \n \n Arizona Metals Intersects 65.2 m at 4.0% CuEq (incl. 14.2 m at 7.3% CuEq) and 27.4 m at 2.5% CuEq (incl. 3.2 m at 7.1% CuEq) in Kay Mine Drilling\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; BORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n /NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO\n \n THE UNITED STATES\n \n /\n \n \n \n \n \n TORONTO\n \n \n ,\n \n \n July 24, 2024\n \n \n /CNW/ - Arizona Metals Corp. (TSX: AMC) (OTCQX: AZMCF) (the \"Company\" or \"Arizona Metals\") is pleased to announce the latest drill results from the Kay Mine Project (\"Kay\" or the \"Property\") in\n \n Arizona\n \n . Seven new drill holes at the Kay Mine Deposit (the \"Kay Deposit\") continue to demonstrate the continuity and expansion potential of the deposit and returned excellent grades in the deeper portions of the deposit.\n \n \n \n Highlights of the recent drilling include:\n \n \n \n \n Hole KM-24-\n \n 94B\n \n intersected\n \n 65.2 m\n \n @ 4.0% CuEq, including\n \n 14.2 m\n \n @ 7.3% CuEq and\n \n 10.4 m\n \n @ 7.0% CuEq. This hole returned among the highest gold assays to date on the project, 22.3 g/t Au (751.9-\n \n 753.5 m\n \n ), and among the highest copper grades to date, 13.7% Cu (745.9-\n \n 746.2 m\n \n ). The hole also showed a northern continuation of outstanding mineralization previously intersected in hole KM-21-\n \n 27B\n \n (\n \n 97.1 m\n \n @ 3.3% CuEq).\n \n \n Hole KM-24-146A cut\n \n 61.1 m\n \n @ 1.4% CuEq, including\n \n 4.6 m\n \n @ 9.4% CuEq. Drilled deeper in the deposit, this hole added considerable thickness and continuity in a 85-m gap between previous holes.\n \n \n Hole KM-24-146 returned\n \n 27.4 m\n \n @ 2.5% CuEq, in...

More updates from Arizona Metals Corp