Business
Arizona Metals Corp’s Kay Mine Drilling Intersects 68.4 m at 6.7 g/t AuEq; 84.4 m at 5.3 g/t AuEq; and 72.5 m at 2.5% CuEq
TORONTO / Mar 23, 2022 / Business Wire / Arizona Metals Corp. (TSX.V:AMC, OTCQX:AZMCF) (the “Company” or “Arizona Metals”) is pleased to announce the results of

About this update from Arizona Metals Corp
[{"type":"text","content":"TORONTO / Mar 23, 2022 / Business Wire / Arizona Metals Corp. (TSX.V:AMC, OTCQX:AZMCF) (the “Company” or “Arizona Metals”) is pleased to announce the results of six recently completed drill holes at its Kay Mine project in Yavapai, County Arizona. An additional 20 holes are pending, with three drill rigs turning 24 hours per day. Marc Pais, CEO, commented “Drilling at the Kay Mine Project continues to intersect very large widths and high grades of massive sulphide mineralization. The holes released today demonstrate excellent continuity of mineralization in all directions, while also showing that mineralization is substantially thicker than suggested by our original modelling. Drilling has extended mineralization well into both the hanging-wall and foot-wall envelopes, which gives the potential to define a significant tonnage of mineralization. Hole 51B showed the deepest mineralization assayed to date, at a vertical depth of 900 meters. Drilling is currently underway to test for depth extensions to at least 1,100 meters, while also testing for lateral extensions of the thick hinge zone. The twenty holes pending all encountered semi-massive or massive sulphide mineralization, and those intersections are guiding the drilling currently underway. We have drilled approximately 45,000 meters at Kay to date, with each hole solidifying our opinion that this is one of the very few large precious-metals rich VMS deposits not yet mined, and more importantly, is potentially part of a much larger mineralized system that has yet to be explored. To that end, we recently completed a property-wide ground-loop electromagnetic survey, which will serve to refine and improve the resolution of the Central and Western targets, located approximately 300 meters and 1,000 meters west of Kay, respectively. Drill pad and road permitting is currently underway for these targets, with a detailed update expected in the next few weeks.” Drilling Highlights Hole KM-21-58 intersected 68.4 m at a grade of 6.7 g/t AuEq, including higher-grade intervals of 7.3 m grading 10.1 g/t AuEq and 10.5 m grading 21.1 g/t AuEq, from a depth of 614 m. This hole is in the central portion of the deposit, and demonstrates excellent continuity of mineralization between holes 26, 28, 25A, and 40. Hole KM-21-58A intersected 72.5 m at a grade of 2.5% CuEq, including higher grade inte...