Business
Arizona Metals Announces Initial Drill Results from Sugarloaf Peak Drilling
Arizona Metals Announces Initial Drill Results from Sugarloaf Peak Drilling Canada NewsWi...

About this update from Arizona Metals Corp
[{"type":"text","content":"\n\n\nArizona Metals Announces Initial Drill Results from Sugarloaf Peak Drilling\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n\n\n\n\n\nCanada NewsWire\n\n\n/NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES/\nTORONTO, Dec. 2, 2025 /CNW/ - Arizona Metals Corp. (TSX: AMC) (OTCQX: AZMCF) (the \"Company\" or \"Arizona Metals\") is pleased to announce the first round of results from its 2025 reverse-circulation drill program on the Sugarloaf Peak project in Arizona. Highlights of the drilling include:\nSP-25-09: 195.1 m @ 0.31 g/t Au, including 25.9 m @ 0.61 g/t Au. This was an infill hole in the center of the deposit, demonstrating excellent continuity and mineralization from surface.SP-25-11: 109.7 m @ 0.31 g/t Au, including 16.8 m @ 0.49 g/t Au. This was an infill hole in a 300 x 300 m gap in the north-central part of the deposit; together with holes 12 and 13, this confirms good continuity of mineralization in this area, adding significant volume to the deposit.SP-25-05: 134.1 m @ 0.29 g/t Au and 70.1 m @ 0.32 g/t Au. This was a twin of historic hole WW-9 in the central portion of the deposit.SP-25-12: 73.2 m @ 0.27 g/t Au and 41.1 m @ 0.30 g/t Au. This was an infill hole in a 300 x 300 m gap in the north-central part of the deposit.Mineralization was intersected in all nine drill holes assayed to date in an area covering 900 m along the strike of mineralization and 800 m in width. These initial drill results are consistent with the drill program goals, as these results demonstrate mineralization in all infill holes and extend mineralization in all step-out holes received to date. In several drill holes, mineralization was also extended at a depth below previous drilling by 40-75 m. Assay results from the remaining 16 drill holes are pending. The total drilling to date on the project, in 2025, comprises 5,186 m drilled in 25 reverse-circulation drill holes.\nDuncan Middlemiss, President and CEO of Arizona Metals co...