Business
Arizona Gold & Silver Inc. Reports on Drilling Progress on the Philadelphia Gold-Silver Project, Arizona
(TheNewswire) Vancouver, British Columbia – TheNewswire - May ...

About this update from Arizona Gold & Silver Inc.
[{"type":"text","content":"Arizona Gold & Silver Inc. Reports on Drilling Progress on the Philadelphia Gold-Silver Project, Arizona\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Vancouver,\n \n \n British\n \n \n Columbia –\n \n \n TheNewswire -\n \n \n May\n \n \n 06,\n \n \n 2024\n \n \n –\n \n \n Arizona\n \n \n Gold\n \n \n &\n \n \n Silver\n \n \n Inc.\n \n \n \n (TSXV:\n \n \n \n AZS\n \n \n )\n \n \n (\n \n \n OTC:AZASF\n \n \n ) is pleased\nto share progress on reverse circulation (RC) drilling on the\nPhiladelphia Gold-Silver Property, located in Mohave County,\nArizona.\n \n \n \n \n Mr. Greg Hahn, VP Exploration commented,\n \n \n “Drilling is testing the 400 metre\nstrike length of the Resaca patented\n \n \n claim,\n \n \n a\n \n \n segment\n \n \n of\n \n \n the\n \n \n Philadelphia\n \n \n vein\n \n \n system\n \n \n that\n \n \n had\n \n \n not\n \n \n been\n \n \n previously\n \n \n drilled.\n \n \n The\n \n \n area\n \n \n being tested has 5-20\nmetres of alluvial cover. It is bounded to the north by old mine\nworkings and to the south by extensive exposures of stockwork quartz\non the Rising Fawn claim. Prior drilling on the Rising Fawn\nintersected thick intercepts of gold mineralization below stockwork\nquartz outcrops. Current drilling has intersected stockwork quartz in\nall 18 drill holes completed to date, a positive sign that gold\nmineralization continues beneath the alluvial cover”.\n \n \n \n \n \n \n \n \n \n Click Image To View Full Size\n \n \n \n \n \n \n Drilling\n \n \n Program\n \n \n \n \n This\n \n \n program\n \n \n will\n \n \n complete\n \n \n drill\n \n \n testing\n \n \n of\n \n \n the\n \n \n shallow\n \n \n portion\n \n \n of\n \n \n the\n \n \n Philadelphia\n \n \n vein\n \n \n system\n \n \n to\n \n \n help\n \n \n establish priorities\n \n \n for\n \n \n deeper\n \n \n drilling.\n \n \n Drilling\n \n \n commenced\n \n \n the\n \n \n week\n \n \n of\n \n \n April\n \n \n 10\n \n \n and\n \n \n has\n \n \n progressed\n \n \n southerly\n \n \n from\n \n \n the\n \n \n \n \n the north end of the Resaca claim, immediately south of\nthe historic R1 shaft. To date we have completed 18 holes along a\nstrike length of some 300 metres. Quartz stockwork mineralization has\nbeen intersected in all holes with\n \n \n several holes\...