Business
Arizona Gold & Silver Announces Drill on Site to Test the Red Hills Bulk Tonnage Target on the Philadelphia Project, Arizona
(TheNewswire) Click Image To View Full Size Vancouver, Brit...

About this update from Arizona Gold & Silver Inc.
[{"type":"text","content":"Arizona Gold & Silver Announces Drill on Site to Test the Red Hills Bulk Tonnage Target on the Philadelphia Project, Arizona\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n Click Image To View Full Size\n \n\n\n Vancouver, British\nColumbia –\n \n\n\n\n TheNewswire -\n \n\n\n\n October\n \n\n\n\n 8\n \n\n\n\n , 2024 –\n \n\n\n\n Arizona Gold &\nSilver Inc.\n \n\n\n\n (TSXV: AZS)\n \n\n\n\n (\n \n\n\n\n OTCQB:AZASF\n \n\n\n\n ) is pleased to announce site preparation is\nnearing completion for diamond core drilling  on  the Red Hills bulk\ntonnage target on the Philadelphia Gold-Silver property. The target is\nthe down dip extension to known mineralization and the western fringe\nof a CSAMT anomaly below a hydrothermally altered flow dome known as\nRed Hill.\n \n\n\n\n\n\n Significant drill intercepts in holes\nPRC21-80 and PRC21-85 were\n \n\n\n 103.70 metres\ngrading 1.57 grams per tonne (gpt) gold and 7.6 gpt silver, and\n \n 115.85 metres grading 1.34 gpt gold and 5.78 gpt silver,\nrespectively.  The new core holes will be drilled from unpatented\nclaims on BLM administered land where drilling permits were recently\nreceived. Additional holes are planned to further test this target\nboth along strike and down dip to the east.\n \n\n Greg Hahn, Vice President of Exploration, states “\n \n We are excited to be drilling our Red Hill\ntarget. The hydrothermally altered flow dome and the underlying CSAMT\nanomaly just to the east have considerable dimensions. That combined\nwith +100 metre mineralized intercepts on the western side of the\ntarget area provide ample encouragement for this program. Success in\nthis drilling will have a significant impact on the potential size of\nthe Philadelphia epithermal gold-silver system”.\n \n\n\n Drill holes are expected to take 10-20 days each to complete.\n Drilling will proceed on a 20 days on and 10 days off schedule,\noperating one 10-hour shift per day. Upon the completion of each hole,\ncore will be transported to the ALS Laboratories sample preparation\nfacility in Tucson, Arizona, where core will be photographed, sawed\nand sampled according to explicit instructions from the project\ngeologist. Samples will be crushed, split, and pulverized at the ALS\nfacility in Tucson and rep...