Business

Drilling Results from Main & South Zones at Tavşan

Ariana Resources PLC has announced positive drilling results from the Main and South Zones at its Tavşan Mine in western Türkiye, with key intercepts including 15.7m at 1.51g/t Au + 7.82g/t Ag and 7.4m at 2.76g/t Au + 3.10g/t Ag. These results indicate resource expansion opportunities and completed infill drilling, with drilling continuing in other areas of the mine. The company expects a JORC Resource update in Q2 2026, and is optimising pit designs at a gold price of US$3,500 per ounce, significantly higher than previous optimisations. Disclaimer*

articleAriana Resources PlcJanuary 21, 20263/company/ariana-resources-plc/news/drilling-results-from-main-and-south-zones-at-tavsan
Drilling Results from Main & South Zones at Tavşan

About this update from Ariana Resources Plc

[{"type":"text","content":"\n\n \n\n\n\n\n\n\n\n\n\n\n\n\n21 January 2026\nAIM: AAU\nDrilling Results from Main and South Zones at Tavşan Mine\nAriana Resources plc (AIM: AAU, ASX: AA2, \"Ariana\" or the \"Company\"), the mineral exploration, development and production company with gold project interests in Africa and Europe, provides the following summary of the ongoing drilling programme at Tavşan Mine, western Türkiye (23.5% owned by Ariana).\nHighlights:\n·   Following on from the announcement on 13 November 2025 of high-grade gold in drilling results from the North at Tavşan Mine, this announcement covers the assay results received from the 85-hole programme at Tavşan Main Zone and South Zone.\n·   The drilling on the Main and South Zones identified resource expansion opportunities and completed infill drilling.\n·    Results include the following best intercepts:\no  15.7m @ 1.51g/t Au + 7.82g/t Ag from surface (TAV-D014-25)\no  7.4m @ 2.76g/t Au + 3.10g/t Ag from 16.9 metres (TAV-D030A-25)\no  9.7m @ 1.91g/t Au + 3.27g/t Ag from 0.8 metres (TAV-D079-25)\n·    Drilling is continuing in other areas across the West and East Zones of the Tavşan Mine.\n·   The latest drilling highlights significant potential for growth at the South Zone, with a significant area remaining untested.\n·    A JORC Resource update will be completed at the end of the 15,000m programme at Tavşan, expected in Q2 2026.\n\nDr. Kerim Sener, Managing Director, commented:\n\"These are another great set of results from the Main Zone at Tavşan extending into the South Zone. With drilling ongoing at Tavşan, we are looking forward to further opportunities being identified in the periphery of the currently planned pits.\n \n\"With the gold price continuing its upward trajectory, more of the currently defined resources are likely to be included in our revised pit designs. We are currently optimising our pits at US$3,500 per ounce, compared with previously optimised runs undertaken at significantly lower prices. This already bodes well for the longevity of the Tavşan operation.\"\n\nThis announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.\n \nTavşan Main and South Zone Drilling\nSince the start of drilling at Tavşan in early 2...

More updates from Ariana Resources Plc