Business
Mineralised Zone Extends to 300m Wide, 650m Long
Mineralised Zone Extends to 300m Wide, 650m Long.

About this update from Arc Minerals Limited
[{"type":"text","content":"\n \nRNS Number : 5542J Arc Minerals Limited 20 August 2019 \n\n20 August 2019\n \nArc Minerals Ltd\n('Arc' or the 'Company')\n \nCheyeza East - Mineralised Zone Extends to over 300 Metres Wide and 650 Metres Long\n \nArc Minerals Limited is pleased to announce further drill results from its maiden exploration drill programme at the Cheyeza East target area in Zambia and an update on additional exploration activities at its high-priority West Lunga and Lumbeta targets.\n \nHighlights:\n \nCheyeza East\n \n· Width of mineralised zone extended to over 300m and remains open ended\n· Strike length in the north has extended to at least 650m, also remaining open ended\n· CHDDE006 intersected 19.70m at 0.59% Cu from 15.30m\no Includes 5.80m at 1.00% Cu from 27.70m\n· CHDDE007 intersected 11m @ 0.75% Cu from 69.40m\no Includes 3.9m @ 1.42% Cu from 72.10m\n· CHDDE009 intersected 9.00m @ 0.63% Cu from 11.90m\no Includes 5.00m @ 0.92% Cu from 14.90m\n· Drilling programme progress continues positively and results of several drill holes to follow in near future\n \nAdditional targets\n \n· Completed infill soil sampling at the Lumbeta target area has further refined the 11km long anomalous feature into three distinct target areas, the longest being 4km long.\n· West Lunga target - access and initial drill pad preparation underway - definition of drill targets and drilling plans are well advanced. \n \nNick von Schirnding, Executive Chairman of Arc stated: \"Drill holes six and seven, which were drilled either side of drill holes four and five, have demonstrated that the width of the mineralised zone along this drill profile is now in excess of 300m and still open ended. \n \nDrill holes eight, nine, ten and twelve, drilled along strike and to the north east have confirmed that the strike length to the mineralised zone in the north of this target area is at least 650m long.\n \nAs the team on the ground continues to probe the Cheyeza East target area with coarse spaced drill holes to test the extent of the mineralised area, I am encouraged to see that the mineralisation encountered to date...