Business
Plug Power Executes $132.5 Million Definitive Agreement with Stream Data Centers as First Step in $275 Million Strategic Infrastructure Optimization Initiative
First of three phases of targeted strategic infrastructure optimization initiativeSLINGERLANDS, N.Y., Feb. 26, 2026 (GLOBE NEWSWIRE) -- Plug Power Inc. (NASDAQ: PLUG), a global leader in comprehensive hydrogen solutions for the hydrogen economy, today announced it has entered into definitive agreement with Stream Data Centers, a time-tested hyperscale data center developer and operator with over 25 years of experience delivering high performance compute. The agreement advances Plug’s previously
About this update from Apollo Global Management, Inc. (new)
[{"type":"image","alt":"Plug Power, Inc.","displaySize":"","headline":null,"caption":"Plug Power, Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":233,"height":164,"url":"https://media.zenfs.com/en/globenewswire.com/5b0ba8ecdd6d509c2c90a49c5ef7bc5a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/QtH6YAO6DHnR8RMIbdkrTw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTI5NjtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/5b0ba8ecdd6d509c2c90a49c5ef7bc5a","width":233,"height":164}},"lazy":false},{"type":"text","content":"First of three phases of targeted strategic infrastructure optimization initiative","length":82,"tagName":"p"},{"type":"text","content":"SLINGERLANDS, N.Y., Feb. 26, 2026 (GLOBE NEWSWIRE) -- Plug Power Inc. (NASDAQ: PLUG), a global leader in comprehensive hydrogen solutions for the hydrogen economy, today announced it has entered into definitive agreement with Stream Data Centers, a time-tested hyperscale data center developer and operator with over 25 years of experience delivering high performance compute. The agreement advances Plug’s previously announced initiative to generate more than $275 million in liquidity improvement through a combination of asset monetization, release of restricted cash, and reduced maintenance expenses.","length":605,"tagName":"p"},{"type":"text","content":"Under the executed agreement, Plug expects to receive gross proceeds of at least $132.5 million, with total proceeds of up to $142 million depending on the timing of closing and certain asset-removal conditions. The transaction includes Plug’s interest in the Project Gateway site in New York, comprising the land and associated infrastructure, select substation-related assets, and the assignment of certain related agreements. This asset sale is expected to close on or before the end of June 2026, subject to customary closing conditions, with a long-stop closing date of June 30, 2026. Stream Data Centers will provide a $6 million deposit in connection with the transaction.","length":679,"tagName":"p"},{"type":"text","content":"The transaction is part of a larger proposed development by Stream Data Centers at the STAMP industrial park with an environmentally friendly and a water-efficient air-cooled design, and a low noise profile. Stream Data Centers’ development will utilize existing infrastructure and power allocations, to avoid any...