Business

Andina Copper Intersects 152m at 0.67% Cu from 54m, within 272m at 0.50% Cu

May 13, 2026 – TheNewswire - Vancouver, British Columbia - Andina Copper Corporation (TSX-V: ANDC | FSE: FIR | OTCQB: PMMCF) is pleased to report continuing

articleAndina Copper Corporation.May 13, 20264/company/andina-copper-corporation/news/andina-copper-intersects-152m-at-067percent-cu-from-54m-within-272m-at-050percent-cu
Andina Copper Intersects 152m at 0.67% Cu from 54m, within 272m at 0.50% Cu

About this update from Andina Copper Corporation.

[{"type":"text","content":"May 13, 2026 – TheNewswire - Vancouver, British Columbia - Andina Copper Corporation (TSX-V: ANDC | FSE: FIR | OTCQB: PMMCF) is pleased to report continuing outstanding drill intercepts from the Cobrasco Project in Chocó, Colombia. Drillhole CDH008 was completed to a downhole depth of 652.25m, with results extending the Cobrasco Central Cu-Mo porphyry system to the north. Near-surface mineralization begins at approximately 52m downhole and is associated with multiple mineralized porphyry phases and related magmatic-hydrothermal breccias. Two additional drillholes have subsequently been completed from the same platform, including CDH009 (completed; assays pending) and CDH010 (in progress). Visual logging indicates sulphide mineralization consistent with the broader Cobrasco Central system in both holes. HIGHLIGHTS: CDH008 further confirms the northwest (“NW”) extension of the Cobrasco Cu-Mo mineralized system, returning:  272m @ 0.50% Cu, 75ppm Mo, 1.92g/t Ag from 52m Incl        152m @ 0.67% Cu, 68ppm Mo, 1.90g/t Ag from 54m Drillhole CDH008 was drilled due north to test the northern continuity and extension of the shallow mineralized zone at Cobrasco Central.   Additional step-out drillholes from the same drill pad, including CDH009 (completed) and CDH010 (in progress), are testing northwest and west-southwest (“WSW”) extensions to mineralization, respectively. Assays for both holes remain pending  The Cobrasco mineralized footprint continues to expand with successive drilling and currently extends approximately 1,100m along strike and 550m laterally.   Mineralization remains open in all directions, with further expansion potential toward the NW and WSW imminent, pending results from CDH009 and CDH010.   Ongoing scout drilling continues, with further large step-out holes targeting the NW and northern extensions of the system planned. Andina Copper’s President and CEO Joseph van den Elsen commented: “We continue to systematically advance a wide-spaced scout drilling programme, actively testing the limits of the Cobrasco system with wide fans of significant step-out drillholes. The system continues to grow with each successive drillhole, with the mineralization footprint already covering an area of ~1,100m x 550m, and results from CDH009 and CDH010 expected to further extend. Surf...

More updates from Andina Copper Corporation.