Business
American Salars Lithium to Expand Pocitos Project by 1,635% to 13,880 Hectares in Argentina’s Lithium Triangle
VANCOUVER, BC, March 02, 2025 (GLOBE NEWSWIRE) -- AMERICAN SALARS LITHIUM INC. ("AMERICAN SALARS" OR THE "COMPANY") (CSE: USLI, OTC: USLIF, FWB: Z3P, WKN: A3E2N

About this update from American Salars Lithium Inc.
[{"type":"text","content":" VANCOUVER, BC, March 02, 2025 (GLOBE NEWSWIRE) -- AMERICAN SALARS LITHIUM INC. (\"AMERICAN SALARS\" OR THE \"COMPANY\") (CSE: USLI, OTC: USLIF, FWB: Z3P, WKN: A3E2NY) announces it has entered into a Letter Of Intent Agreement (the “Agreement”) with an arm’s length vendor to acquire up to 100% of the Salar De Pocitos Project (the “Project”) consisting of 10 mineral tenements spanning approximately 13,080 hectares and contiguous to the Company’s 800 hectare Flagship Pocitos 1 Project in Salta Province, Argentina. This represents a property size increase of 1635% to a footprint combined total of 13,880 hectares on the Pocitos Salar, within the prolific Lithium Triangle. The closing of this transaction will culminate in American Salars having the second largest property asset on the Salar de Pocitos. The Company’s existing 800-hectare Pocitos 1 claim has an NI 43-101 Mineral Resource Estimate (“MRE”) prepared by WSP Australia. The MRE infers 760,000 tonnes of Lithium Carbonate Equivalent (“LCE”) on the combined Pocitos 1 (800 Ha) and neighbouring Pocitos 2 block (532 Ha). On a pro-rata basis Pocitos 1 has 456,000 tonnes of LCE insitu. (American Salars does not currently own the neighboring 532 Hectare Pocitos 2 block - See Press Release Dated June 17, 2024). The NI 43-101 MRE was estimated on an inferred basis using a block model with 6% and 14% porosity respectively for the clay and sand lithologies. Completing borehole magnetic resonance surveys will provide continuous and higher accuracy allowing an upgrade of the resource. The new 13,080 hectare Salar De Pocitos Project being acquired has been the subject of numerous historic exploration campaigns including drilling, surface sampling and geophysics. The initial work program will be a data compilation to tie together the existing drill holes on Pocitos 1 with all the historic drill holes and update the Company’s NI 43-101 MRE. Scoping and feasibility studies will follow the data compilation and move the Salar De Pocitos Project through to commercial production. The Salar De Pocitos Project is located approximately 100 kilometers west of San Antonio de Los Cobres which is the largest city at the top of the puna plateau and approximately 250 kilometers west of the Provincial Capital of Salta. The Pocitos Project benefits from some of the best infrastructure on the puna including P...